<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

<strong>Research</strong> <str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong><br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Ending MARCH 2012<br />

Project Title: Analysis of Superstructures of Integral Abutment Bridges Last Updated: 6/22/2012 <str<strong>on</strong>g>Report</str<strong>on</strong>g> Generated:6/27/2012<br />

QPR Author Name: James LaFave<br />

Teleph<strong>on</strong>e: 217-333-8064 Project Completed: 5%<br />

Percent Time Used to Date: %<br />

TRP Chair Approved: 6/14/2012<br />

Project Number: R27-115 Functi<strong>on</strong> Code: R27-115<br />

Estimated Dates<br />

Fiscal Year: 2012<br />

Project Status: On Schedule (green)<br />

Task Title Start Complete <strong>Progress</strong> this Quarter Completed<br />

Project Start Date: 3/1/2012 Original Project End Date: 12/31/2014 Number of Extenti<strong>on</strong>s: 0 Current Project End Date:<br />

Original Project Budget: $300000 Number of Budget Changes: 0 Current Project Budget: $300000<br />

Total Funds Expended this Quarter: $0 Total Project Expenses to Date: $0 Total % Of Budget Spent To Date: 0%<br />

Project Descripti<strong>on</strong>:<br />

The primary objective of this research is to better understand integral abutment bridge (IAB) structural performance from the perspective of<br />

superstructure behavior. The research approach c<strong>on</strong>sists of a combinati<strong>on</strong> of literature review / DOT surveys, analytical modeling of IAB structural<br />

systems, and field m<strong>on</strong>itoring of IABs, in hopes of ultimately providing improved design and c<strong>on</strong>structi<strong>on</strong> details for IAB superstructures,<br />

c<strong>on</strong>sistent with actual stress distributi<strong>on</strong>s observed in the field. This could then lead to expanded use of IAB structures that are more optimized with<br />

respect to their superstructures, while still providing all the benefits of a joint-free bridge. Deeper understanding of IABs developed in this research<br />

may also be valuable in related investigati<strong>on</strong>s of seismic behavior, design, and performance of IAB structures.<br />

Keywords: integral abutment bridges; numerical modeling; field m<strong>on</strong>itoring<br />

Principal Investigator:<br />

Name: James LaFave Organizati<strong>on</strong> / Address<br />

Teleph<strong>on</strong>e: 217-333-8064<br />

Email: jlafave@illinois.edu<br />

UIUC-CEE<br />

Civil & Envir<strong>on</strong> Eng 3108 Newmark Lab 205 N Mathews M/C 250 Urbana, IL 61801<br />

Co-Investigator:<br />

Name: Larry Fahnestock Organizati<strong>on</strong> / Address<br />

UIUC-CEE<br />

Teleph<strong>on</strong>e: 217-265-0211<br />

Email: fhnstck@illinois.edu<br />

<strong>Research</strong> Student Team Members: Kurt Holloway, Huayu An<br />

Technical Review Panel:<br />

Members Teleph<strong>on</strong>e Email Address<br />

Mark Shaffer (Chair) 217-524-3321 Mark.Shaffer@illinois.gov<br />

Meeting Dates - Minutes Available?<br />

<strong>Progress</strong> & Significant Results This Quarter:<br />

Ir<strong>on</strong>ed out all of the budgetary and other initial project planning issues during this quarter, including preparing the compani<strong>on</strong> work plan & budget<br />

for the expanded project scope partially funded by the <strong>Illinois</strong> Tollway. Recruited graduate research assistants to work <strong>on</strong> the project, and then<br />

began work <strong>on</strong> Task 1 ("Literature Search").<br />

Anticipated Work Next Quarter:<br />

Page 1 of 2<br />

C<strong>on</strong>tinue c<strong>on</strong>ducting & reporting <strong>on</strong> the work comprising Task 1.1 ("Literature Review of Prior <strong>Research</strong>") & Task 1.2 ("DOT Survey of Design &<br />

C<strong>on</strong>structi<strong>on</strong> Practices"). Hold the first project TRP meeting. Meet with structural engineering design c<strong>on</strong>sultants from IDOT and/or the <strong>Illinois</strong><br />