24.01.2013 Views

Quarterly Management Report on Research Progress - Illinois ...

Quarterly Management Report on Research Progress - Illinois ...

Quarterly Management Report on Research Progress - Illinois ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Sean Coyle 309-671-3456 sean.coyle@illinois.gov<br />

Maureen Addis 309-671-3495 maureen.addis@illinois.gov<br />

Dean Menjes 217-492-4631 dean.mentjes@dot.gov<br />

Tom Huffnagle 815-434-8418 Thomas.Hufnagel@illinois.gov<br />

Juan David Pava 217-782-0551 Juan.Pava@illinois.gov<br />

Meeting Dates - Minutes Available?<br />

11/3/2010 - Yes 3/31/2011 - Yes 9/30/2011 - Yes<br />

<strong>Progress</strong> & Significant Results This Quarter:<br />

Task 2. Literature Review<br />

A draft of the literature review document is being prepared. The research team will finalize the draft and will submit it to the TRP for review. There<br />

were additi<strong>on</strong>al publicati<strong>on</strong>s from the TRB meeting that were reviewed and incorporated into the literature review document.<br />

Task 3. Survey of Driver Understanding of FYA<br />

Phase two of the survey disseminati<strong>on</strong> began in January 2012. The research team asked the City of East Peoria, the Washingt<strong>on</strong> Chamber of<br />

Commerce, and neighborhood associati<strong>on</strong> presidents to distribute the survey link to area residents. 236 resp<strong>on</strong>ses have been received as of April 16,<br />

2012 and phase two of the survey was closed.<br />

Task 5. Collect and Analyze Operati<strong>on</strong>al and Traffic C<strong>on</strong>flict Data<br />

Traffic volumes, gap data, c<strong>on</strong>flict data, and red and yellow light running data has been extracted from all of the before and after period videos.<br />

Analysis and statistical testing is almost complete for all MOEâ€s.<br />

Task 6. Collect and Analyze Traffic Crash Data<br />

All crash data is analyzed through October 2011 for the FYA test sites. Currently, the research team has a minimum of three m<strong>on</strong>ths of after crash<br />

data at all 86 applicable sites. At these sites, the days of after crash data analyzed range from 94 days to 388 days. The preliminary crash data shows<br />

a reducti<strong>on</strong> in total crashes, left-turn related crashes, LTHO crashes, and injury crashes for the by FYA approach analysis for all 164 approaches. It<br />

should be noted that statistical testing <strong>on</strong> these crash frequencies has yet to be performed.<br />

A before and after with c<strong>on</strong>trol site comparis<strong>on</strong> is underway with the 52 total pairs of test and c<strong>on</strong>trol sites. Statistical testing will also begin <strong>on</strong>ce<br />

more data has been analyzed.<br />

Task 7. <str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> and Mid-Project Meeting<br />

The next progress meeting is scheduled for April 26, 2012.<br />

Task 8. C<strong>on</strong>duct Statistical Analyses<br />

Statistical testing <strong>on</strong> gap data, YLR, RLR, traffic c<strong>on</strong>flict data, and crashes is currently being c<strong>on</strong>ducted.<br />

Anticipated Work Next Quarter:<br />

Task 2. Literature Review<br />

The research team will present the highlights of the literature review to the TRP at the meeting in April.<br />

Task 3. Survey of Driver Understanding of FYA<br />

The results of Phase I and Phase II survey results will be documented and presented to the TRP.<br />

Task 5. Collect and Analyze Operati<strong>on</strong>al and Traffic C<strong>on</strong>flict Data<br />

Summaries of each measure of effectiveness (MOE) will be prepared. Statistical analysis of the operati<strong>on</strong>al data is expected to be completed in the<br />

next quarter.<br />

Task 6. Collect and Analyze Traffic Crash Data<br />

The research team will c<strong>on</strong>tinue to update the results of the before and after study <strong>on</strong>ce additi<strong>on</strong>al data becomes available.<br />

A before and after with c<strong>on</strong>trol site comparis<strong>on</strong> has also begun with the 52 total pairs of test and c<strong>on</strong>trol sites. Statistical testing will also begin <strong>on</strong>ce<br />

more data has been analyzed. Analyses for the Empirical Bayes method will also be started in the next quarter.<br />

Task 7. <str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> and Mid-Project Meeting<br />

The next meeting has been scheduled for April 26th.<br />

Task 8. C<strong>on</strong>duct Statistical Analyses<br />

Statistical testing <strong>on</strong> crash data will begin next quarter.<br />

Project Impediments & Recommended Soluti<strong>on</strong>s:<br />

64<br />

Page 2 of 3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!