<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />
Meeting Dates - Minutes Available?<br />
8/25/2009 - Yes 9/22/2009 - No 3/17/2010 - No 12/7/2010 - Yes 3/29/2011 - Yes 12/8/2011 - Yes<br />
<strong>Progress</strong> & Significant Results This Quarter:<br />
Based <strong>on</strong> feedback provided at the meeting of TRP <strong>on</strong> Dec 8, 2011, two reports were prepared. The first report is c<strong>on</strong>tains the background<br />
informati<strong>on</strong> and past study finding. The sec<strong>on</strong>d report is about the finding from field testing and cost analysis. The reports were submitted to TRP<br />
for review and approval.<br />
Limited field data <strong>on</strong> light level at the Post Oak Rest Area <strong>on</strong> I 70 near Effingham was collected in January 2012. The results were send to IDOT.<br />
Anticipated Work Next Quarter:<br />
Obtain feedback from TRP and finalize the reports.<br />
Project Impediments & Recommended Soluti<strong>on</strong>s:<br />
Deliverables and Implementati<strong>on</strong> Strategy:<br />
Last Updated: 5/18/2012<br />
Approved By TRP Chair: 3/26/2012<br />
ICT Project Home<br />
30<br />
Page 2 of 2