Quarterly Management Report on Research Progress - Illinois ...
Quarterly Management Report on Research Progress - Illinois ...
Quarterly Management Report on Research Progress - Illinois ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />
<strong>Research</strong> <str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong><br />
<str<strong>on</strong>g>Report</str<strong>on</strong>g><br />
Ending MARCH 2012<br />
Project Title: LED Roadway Lighting Evaluati<strong>on</strong> and Field Testing Last Updated: 5/18/2012 <str<strong>on</strong>g>Report</str<strong>on</strong>g> Generated:6/27/2012<br />
QPR Author Name: Rahim Benekohal<br />
Teleph<strong>on</strong>e: (217) 244-6288 Project Completed: 98%<br />
Percent Time Used to Date: 100 %<br />
TRP Chair Approved: 3/26/2012<br />
Project Number: R27-76 Functi<strong>on</strong> Code: R27-76<br />
Estimated Dates<br />
Fiscal Year: 2012<br />
Project Status: On Revised Schedule (green)<br />
Task Title Start Complete <strong>Progress</strong> this Quarter Completed<br />
Task 1: Literature review 11/1/2009 6/30/2010 No Yes<br />
Task 2: Decide <strong>on</strong> test c<strong>on</strong>diti<strong>on</strong>s and methods 2/1/2010 3/30/2010 No Yes<br />
Task 3: Obtain LED luminaries 3/1/2010 12/30/2010 No Yes<br />
Task 4: Install LED luminaires and prepare for testing 4/1/2010 12/30/2010 No Yes<br />
Task 5: Data collecti<strong>on</strong> and analysis 4/1/2010 12/30/2010 No Yes<br />
Task 6: Prepare <str<strong>on</strong>g>Report</str<strong>on</strong>g>s 7/1/2011 12/31/2011 Yes No<br />
Project Start Date: 11/1/2009 Original Project End Date: 10/31/2011 Number of Extenti<strong>on</strong>s: 1 Current Project End Date: 3/31/2012<br />
Original Project Budget: $276200 Number of Budget Changes: 1 Current Project Budget: $302600<br />
Total Funds Expended this Quarter: $0 Total Project Expenses to Date: $0 Total % Of Budget Spent To Date: 0%<br />
Project Descripti<strong>on</strong>:<br />
This research will allow IDOT to evaluate the possibility of using LED light <strong>on</strong> highways. LED lighting may use less energy than high intensity<br />
discharge (HID) lamps comm<strong>on</strong>ly used in roadway lighting. <strong>Research</strong> will be d<strong>on</strong>e <strong>on</strong> the current state of technology in LED roadway lighting and<br />
identify the best commercially available LED roadway luminaires for IDOT lighting applicati<strong>on</strong>s. Obtain luminaires for field testing, field verify<br />
photometry, and calculate results of their performance for typical IDOT roadways. Compare LED performance to existing light sources and provide<br />
ec<strong>on</strong>omic justificati<strong>on</strong> for or against the use of LED roadway lighting.<br />
Keywords: LED, luminaires, photometry, lighting<br />
Principal Investigator:<br />
Name: Rahim Benekohal Organizati<strong>on</strong> / Address<br />
Teleph<strong>on</strong>e: (217) 244-6288<br />
Email: rbenekoh@illinois.edu<br />
UIUC-CEE<br />
CEE 205 N. Mathews Ave. Urbana, IL 61801<br />
<strong>Research</strong> Student Team Members: Kivanc Avrenli and Hani Ramezani, juan medina, ali hajbabaie<br />
Technical Review Panel:<br />
Members Teleph<strong>on</strong>e Email Address<br />
Mark Seppelt (Chair) 217-785-0382 Mark.Seppelt@illinois.gov<br />
Craig Mitckes 217-782-2984 Craig.Mitckes@illinois.gov<br />
Joseph Vespa 217-782-3479 Joseph.Vespa@illinois.gov<br />
Ryan D Sheley Ryan.Sheley@illinois.gov<br />
Randy Laninga 309-671-4477 Randall.Laninga@illinois.gov<br />
Yogesh P Gautam Yogesh.Gautam@illinois.gov<br />
Carl K. Andersen 217-492-4281 carl.andersen@dot.gov<br />
Dave Piper 217-785-0720 dave.piper@illinois.gov<br />
Dean Mentjes 217-492-4631 dean.mentjes@dot.gov<br />
29<br />
Page 1 of 2