<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

7/26/2010 - Yes 9/14/2010 - Yes 11/4/2010 - Yes 2/8/2011 - Yes 2/15/2012 - Yes<br />

<strong>Progress</strong> & Significant Results This Quarter:<br />

A report was prepared and sent to TRP for review. The report c<strong>on</strong>tains the findings for the "normal" weather c<strong>on</strong>diti<strong>on</strong>s. Data reducti<strong>on</strong> for adverse<br />

weather c<strong>on</strong>diti<strong>on</strong>s has begun.<br />

A meeting with the project TRP was held <strong>on</strong> Feb 15, 2012.<br />

Anticipated Work Next Quarter:<br />

C<strong>on</strong>tinue data collecti<strong>on</strong> for inclement weather c<strong>on</strong>diti<strong>on</strong>s (fog, rain, and thunderstorm).<br />

Analyze the data for snow c<strong>on</strong>diti<strong>on</strong>s.<br />

Preparati<strong>on</strong> for data collecti<strong>on</strong> at railroad crossing in Chicago area will c<strong>on</strong>tinue. At the RR site the installati<strong>on</strong> and pre-testing is near completi<strong>on</strong>.<br />

Project Impediments & Recommended Soluti<strong>on</strong>s:<br />

The installati<strong>on</strong> at the RR crossing in Hinsdale (Chicago area) has not progressed as fast as we had planned for. The installati<strong>on</strong> is d<strong>on</strong>e by a<br />

c<strong>on</strong>sulting firm and is not a part of this study. So we have no c<strong>on</strong>trol over it. We are told (by ICC staff)that the installati<strong>on</strong> and testing by the<br />

c<strong>on</strong>cultant should be over by July. After that we can began collecting data.<br />

Deliverables and Implementati<strong>on</strong> Strategy:<br />

Last Updated: 6/18/2012<br />

ICT Project Home<br />

60<br />