Project Title: Field Evaluati<strong>on</strong> of Smart Sensor Vehicle Detectors at<br />
Intersecti<strong>on</strong>s & RR Crossings<br />
QPR Author Name: Ray Benekohal<br />
Teleph<strong>on</strong>e: 217-244-6288 Project Completed: 70%<br />
Percent Time Used to Date: 100 %<br />
<strong>Research</strong> <str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong><br />
<str<strong>on</strong>g>Report</str<strong>on</strong>g><br />
Ending MARCH 2012<br />
Last Updated: 6/18/2012 <str<strong>on</strong>g>Report</str<strong>on</strong>g> Generated:6/27/2012<br />
TRP Chair Approved:<br />
Project Number: R27-95 Functi<strong>on</strong> Code: R27-95<br />
Estimated Dates<br />
Fiscal Year: 2012<br />
Project Status: Behind Schedule<br />
(red)<br />
Task Title Start Complete <strong>Progress</strong> this<br />
Quarter<br />
Completed<br />
Task 1: Literature review 9/15/2010 5/15/2011 No Yes<br />
Task 2: Testing criteria and methods 11/15/2010 5/15/2010 No Yes<br />
Task 3: Obtain the equipment 1/15/2011 6/15/2011 No Yes<br />
Task 4: Install the detectors and prepare them for testing 3/15/2011 10/15/2011 No No<br />
Task 5: Data collect and analysis 5/15/2011 7/15/2012 No No<br />
Task 6: <str<strong>on</strong>g>Report</str<strong>on</strong>g> project findings 3/15/2012 8/15/2012 No No<br />
Project Start Date: 9/1/2010 Original Project End Date: Number of Extenti<strong>on</strong>s: 0 Current Project End Date: 8/15/2012<br />
Original Project Budget: $245000 Number of Budget Changes: 0 Current Project Budget: $265502<br />
Total Funds Expended this Quarter: $0 Total Project Expenses to Date: $0 Total % Of Budget Spent To Date: 0%<br />
Project Descripti<strong>on</strong>:<br />
The detecti<strong>on</strong> performance of two smart sensors (Wavetr<strong>on</strong>ix and <strong>on</strong>e other company) will be studies to determine the potential errors <strong>on</strong> such<br />
measure of effectiveness as missed calls, false calls, stuck <strong>on</strong> calls and dropped calls. The potential errors will then be verified by human observers.<br />
The sensors will be installed at an existing test bed in Rantoul that has been used for evaluati<strong>on</strong> of other sensors. The RR site is in Chicago area.<br />
Keywords: smart vehicle sensors, intersecti<strong>on</strong> detectors, microwave vehicle sensors, signalized intersecti<strong>on</strong>s<br />
Principal Investigator:<br />
Name: Ray Benekohal Organizati<strong>on</strong> / Address<br />
Teleph<strong>on</strong>e: 217-244-6288<br />
Email:<br />
rbenekoh@illinois.edu<br />
UIUC-CEE<br />
Civil & Envir<strong>on</strong>mental EngCivil & Envir<strong>on</strong>mental Eng Civil Engineering 1213 Newmark Lab 205 N Mathews M/C<br />
250 Urbana, IL 61801<br />
<strong>Research</strong> Student Team Members: Ali Hajbabaie, Juan Medina, Hani Ramezani<br />
Technical Review Panel:<br />
Members Teleph<strong>on</strong>e Email Address<br />
Yogesh Gautam (Chair) 217-782-3452 Yogesh.Gautam@illinois.gov<br />
Stan Milewski, Co-Chair 815-463-8387 smilewsk@icc.illinois.gov<br />
Kullerstrand, Scott<br />
Burkybile, David H<br />
Price, Kevin D<br />
Dean Mentjes 217-492-4631 dean.mentjes@dot.gov<br />
Meeting Dates - Minutes Available?<br />
59<br />
Page 1 of 2