<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Project Title: Field Evaluati<strong>on</strong> of Smart Sensor Vehicle Detectors at<br />

Intersecti<strong>on</strong>s & RR Crossings<br />

QPR Author Name: Ray Benekohal<br />

Teleph<strong>on</strong>e: 217-244-6288 Project Completed: 70%<br />

Percent Time Used to Date: 100 %<br />

<strong>Research</strong> <str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong><br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Ending MARCH 2012<br />

Last Updated: 6/18/2012 <str<strong>on</strong>g>Report</str<strong>on</strong>g> Generated:6/27/2012<br />

TRP Chair Approved:<br />

Project Number: R27-95 Functi<strong>on</strong> Code: R27-95<br />

Estimated Dates<br />

Fiscal Year: 2012<br />

Project Status: Behind Schedule<br />

(red)<br />

Task Title Start Complete <strong>Progress</strong> this<br />

Quarter<br />

Completed<br />

Task 1: Literature review 9/15/2010 5/15/2011 No Yes<br />

Task 2: Testing criteria and methods 11/15/2010 5/15/2010 No Yes<br />

Task 3: Obtain the equipment 1/15/2011 6/15/2011 No Yes<br />

Task 4: Install the detectors and prepare them for testing 3/15/2011 10/15/2011 No No<br />

Task 5: Data collect and analysis 5/15/2011 7/15/2012 No No<br />

Task 6: <str<strong>on</strong>g>Report</str<strong>on</strong>g> project findings 3/15/2012 8/15/2012 No No<br />

Project Start Date: 9/1/2010 Original Project End Date: Number of Extenti<strong>on</strong>s: 0 Current Project End Date: 8/15/2012<br />

Original Project Budget: $245000 Number of Budget Changes: 0 Current Project Budget: $265502<br />

Total Funds Expended this Quarter: $0 Total Project Expenses to Date: $0 Total % Of Budget Spent To Date: 0%<br />

Project Descripti<strong>on</strong>:<br />

The detecti<strong>on</strong> performance of two smart sensors (Wavetr<strong>on</strong>ix and <strong>on</strong>e other company) will be studies to determine the potential errors <strong>on</strong> such<br />

measure of effectiveness as missed calls, false calls, stuck <strong>on</strong> calls and dropped calls. The potential errors will then be verified by human observers.<br />

The sensors will be installed at an existing test bed in Rantoul that has been used for evaluati<strong>on</strong> of other sensors. The RR site is in Chicago area.<br />

Keywords: smart vehicle sensors, intersecti<strong>on</strong> detectors, microwave vehicle sensors, signalized intersecti<strong>on</strong>s<br />

Principal Investigator:<br />

Name: Ray Benekohal Organizati<strong>on</strong> / Address<br />

Teleph<strong>on</strong>e: 217-244-6288<br />

Email:<br />

rbenekoh@illinois.edu<br />

UIUC-CEE<br />

Civil & Envir<strong>on</strong>mental EngCivil & Envir<strong>on</strong>mental Eng Civil Engineering 1213 Newmark Lab 205 N Mathews M/C<br />

250 Urbana, IL 61801<br />

<strong>Research</strong> Student Team Members: Ali Hajbabaie, Juan Medina, Hani Ramezani<br />

Technical Review Panel:<br />

Members Teleph<strong>on</strong>e Email Address<br />

Yogesh Gautam (Chair) 217-782-3452 Yogesh.Gautam@illinois.gov<br />

Stan Milewski, Co-Chair 815-463-8387 smilewsk@icc.illinois.gov<br />

Kullerstrand, Scott<br />

Burkybile, David H<br />

Price, Kevin D<br />

Dean Mentjes 217-492-4631 dean.mentjes@dot.gov<br />