<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Project Title: Evaluati<strong>on</strong> of the Effect of RAS <strong>on</strong> IDOT Asphalt Mixtures<br />

(Special Project)<br />

QPR Author Name: Hasan Ozer<br />

Teleph<strong>on</strong>e: 893-0705 x237 Project Completed: 50%<br />

Percent Time Used to Date: 100 %<br />

<strong>Research</strong> <str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong><br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Ending MARCH 2012<br />

Last Updated: 5/17/2012 <str<strong>on</strong>g>Report</str<strong>on</strong>g> Generated:6/27/2012<br />

TRP Chair Approved:<br />

Project Number: R27-SP19 Functi<strong>on</strong> Code: R27-SP19<br />

Estimated Dates<br />

Fiscal Year: 2012<br />

Project Status: On Schedule<br />

(green)<br />

Task Title Start Complete <strong>Progress</strong> this<br />

Quarter<br />

Completed<br />

Task 1: Sampling, splitting, and volumetric checks 1/16/2012 2/29/2012 Yes Yes<br />

Task 2: Complex Modulus Testing and Hamburg Wheel Tracker Testing 2/1/2012 4/30/2012 Yes No<br />

Task 3: Fracture Testing (SCB and DCT) 3/1/2012 4/30/2012 Yes No<br />

Task 4: Fatigue Testing (push-pull and Texas Overlay) 3/1/2012 5/31/2012 Yes No<br />

Task 5: Data analysis and reporting 5/1/2012 5/31/2012 No No<br />

Task 6: <str<strong>on</strong>g>Report</str<strong>on</strong>g> Submissi<strong>on</strong> 6/15/2012 6/15/2012 No No<br />

Project Start Date: 12/16/2011 Original Project End Date: 6/15/2012 Number of Extenti<strong>on</strong>s: 0 Current Project End Date: 6/15/2012<br />

Original Project Budget: $30000 Number of Budget Changes: 0 Current Project Budget: $30000<br />

Total Funds Expended this Quarter: $0 Total Project Expenses to Date: $0 Total % Of Budget Spent To Date: 0%<br />

Project Descripti<strong>on</strong>:<br />

The objective of this project is to characterize strength, permanent deformati<strong>on</strong>, and fracture properties of an asphalt mixture with varying<br />

percentages of RAS.<br />

In this study, an experimental program will be c<strong>on</strong>ducted to evaluate the permanent deformati<strong>on</strong>, fracture, and modulus characteristics of an asphalt<br />

mixture with varying percentages of RAS.<br />

Keywords: RAS, asphalt, strength, permanent deformati<strong>on</strong>, fracture<br />

Principal Investigator:<br />

Name: Hasan Ozer Organizati<strong>on</strong> / Address<br />

Teleph<strong>on</strong>e: 893-0705 x237<br />

Email: hozer2@illinois.edu<br />

UIUC<br />

1611 Titan Drive Rantoul, IL 61866<br />

<strong>Research</strong> Student Team Members: Angeli Gamez, Ahmad Kanaan<br />

Technical Review Panel:<br />

Members Teleph<strong>on</strong>e Email Address<br />

David Lippert (Chair) 217-782-6732 David.Lippert@illinois.gov<br />

Meeting Dates - Minutes Available?<br />

<strong>Progress</strong> & Significant Results This Quarter:<br />

1. Splitting and sampling of the loose mixes were completed for volumetric checks (Gmm and Gmb).<br />

2. Hamburg tests were completed for samples prepared from loose mixes and field cores.<br />

3. Samples were prepared for complex modulus testing. Tests have started with the low temperature (-10 C).<br />

4. Samples were prepared for fracture testing (SCB) from loose mixes. SCB tests were completed at -12 C.<br />

104<br />