<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Kim Kolody, Co-Chair 312-402-3792 Kim.Kolody@illinois.gov<br />

Meeting Dates - Minutes Available?<br />

1/18/2012 - Yes 2/7/2012 - Yes<br />

<strong>Progress</strong> & Significant Results This Quarter:<br />

1. The input data needed for Highway Safety Manual have been identified.<br />

2. IDOT GIS database and NAVTAQ database were collected.<br />

3. <strong>Research</strong> team examined the attributes of the road features in IDOT GIS database to understand which variables are available for the HSM model<br />

requirements.<br />

4. Preliminary tests <strong>on</strong> how to estimate some variables, such as curve radius, slope, etc. using ArcGIS software suite have been c<strong>on</strong>ducted.<br />

5. A survey questi<strong>on</strong>naire <strong>on</strong> highway roadside feature data collecti<strong>on</strong> was developed.<br />

6. An extensive literature <strong>on</strong> highway inventory data collecti<strong>on</strong> methods was c<strong>on</strong>ducted.<br />

7. The field tests were c<strong>on</strong>ducted <strong>on</strong> recorded GPS data to investigate the capabilities of extracting roadway data from geo-referenced video for<br />

input into the HSM models.<br />

8. Other methods, including terrestrial laser scanning, photogrammetric methods, organized mobile LiDAR, were tested in the field.<br />

9. A sample mobile LiDAR dataset was acquired from the Woolpert.<br />

10. Other data sources for school locati<strong>on</strong>s and liquor sale store locati<strong>on</strong>s were identified.<br />

Anticipated Work Next Quarter:<br />

1. A nati<strong>on</strong>wide survey will be c<strong>on</strong>ducted.<br />

2. More methods will be tested in the field and labs.<br />

3. The results of Tasks 1-4 of the Phase I project will be presented at the next TRP meeting <strong>on</strong> May 2nd, 2012.<br />

Project Impediments & Recommended Soluti<strong>on</strong>s:<br />

Deliverables and Implementati<strong>on</strong> Strategy:<br />

Last Updated: 7/17/2012<br />

ICT Project Home<br />