<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

<strong>Research</strong> <str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong><br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Ending MARCH 2012<br />

Project Title: Performance Evaluati<strong>on</strong> of Snow & Ice Plows Last Updated: 6/18/2012 <str<strong>on</strong>g>Report</str<strong>on</strong>g> Generated:6/27/2012<br />

QPR Author Name: Souhail Elhouar<br />

Teleph<strong>on</strong>e: 309 677-3830 Project Completed: 20%<br />

Percent Time Used to Date: 0 %<br />

TRP Chair Approved: 4/12/2012<br />

Project Number: R27-94 Functi<strong>on</strong> Code: R27-94<br />

Estimated Dates<br />

Fiscal Year: 2012<br />

Project Status: Behind Schedule (red)<br />

Task Title Start Complete <strong>Progress</strong> this Quarter Completed<br />

Task 1: Literature Review and Synthesis of Best Practices 9/1/2011 11/15/2011 No No<br />

Task 2: Develop a Performance Evaluati<strong>on</strong> Procedure 10/1/2011 1/31/2012 No No<br />

Task 3: Perform Field Tests 1/2/2012 3/31/2013 No No<br />

Project Start Date: 9/1/2011 Original Project End Date: Number of Extenti<strong>on</strong>s: 0 Current Project End Date: 8/31/2013<br />

Original Project Budget: $250000 Number of Budget Changes: 0 Current Project Budget: $249999<br />

Total Funds Expended this Quarter: $0 Total Project Expenses to Date: $0 Total % Of Budget Spent To Date: 0%<br />

Project Descripti<strong>on</strong>:<br />

In this study, snow and ice removal trucks will be instrumented to measure plows scraping forces and shock accelerati<strong>on</strong>. Several plows and blades<br />

as recommended by IDOT will be tested; testing will cover different angles, speeds, and designs. Interstate highways and sec<strong>on</strong>dary roads will be<br />

utilized during snow storms of 2011 and 2012 winter seas<strong>on</strong>s<br />

Keywords: snow plow testing; best practices; snow and ice plowing; plow and truck instrumentati<strong>on</strong><br />

Principal Investigator:<br />

Name: Souhail Elhouar Organizati<strong>on</strong> / Address<br />

Teleph<strong>on</strong>e: 309 677-3830<br />

Email: selhouar@bradley.edu<br />

Bradley University<br />

Department of Civil Engineering & C<strong>on</strong>structi<strong>on</strong> Jobst Hall 206 1501 W Bradley Ave | Peoria, IL 61625<br />

Co-Investigator:<br />

Name: Enad Mahmoud Organizati<strong>on</strong> / Address<br />

Bradley University<br />

Teleph<strong>on</strong>e: 309-677-2716<br />

Email: emahmoud@bradley.edu<br />

<strong>Research</strong> Student Team Members: Ryo (Clifford) Sugisawa and Drew Dragoo<br />

Technical Review Panel:<br />

Members Teleph<strong>on</strong>e Email Address<br />

Tim Peters (Chair) 217-782-8419 Tim.Peters@illinois.gov<br />

Meeting Dates - Minutes Available?<br />

9/15/2011 - Yes 10/20/2011 - Yes<br />

<strong>Progress</strong> & Significant Results This Quarter:<br />

Page 1 of 2<br />

The most significant accomplishments of this past quarter are the identificati<strong>on</strong> of field testing parameters, the finalizati<strong>on</strong> of the field testing<br />

procedure to use, and the acquisiti<strong>on</strong> of the testing equipment. The investigating team came up with an approach for testing snow plows that has<br />

never been used before according to available literature.<br />