24.01.2013 Views

Quarterly Management Report on Research Progress - Illinois ...

Quarterly Management Report on Research Progress - Illinois ...

Quarterly Management Report on Research Progress - Illinois ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Sean Coyle (Chair) 309-671-3456 sean.coyle@illinois.gov<br />

Priscilla Tobias Priscilla.Tobias@illinois.gov<br />

Alan Ho Alan.Ho@dot.gov<br />

Randy Laninga Randall.Laninga@illinois.gov<br />

Dan Mlacnik Dan.Mlacnik@illinois.gov<br />

Greg Feeney Greg.Feeny@illinois.gov<br />

Kyle Armstr<strong>on</strong>g Kyle.Armstr<strong>on</strong>g@illinois.gov<br />

Juan Pava Juan.Pava@illinois.gov<br />

Meeting Dates - Minutes Available?<br />

<strong>Progress</strong> & Significant Results This Quarter:<br />

Task 2. Literature Review<br />

Internet queries have been c<strong>on</strong>ducted using the Transportati<strong>on</strong> <strong>Research</strong> Board (TRB), TRIS, and other search engines to obtain relevant journal<br />

papers pertaining to right turn islands. The research team has assembled a list of references and reviewed 25 papers. 19 of these papers are<br />

somewhat relevant to this study and have been reviewed further. Summaries of the initial review are being prepared and will be presented to the<br />

TRP in April at the next progress meeting.<br />

Task 3. Identify Candidate C<strong>on</strong>trol Sites and Finalize Experimental Plans<br />

The characteristics of all 10 test sites have been reviewed and approximate matches have been found for some of the sites. The c<strong>on</strong>trol sites that are<br />

paired with the test sites are being reviewed and compared to make sure that the best possible pairs are selected. All of the c<strong>on</strong>trol sites are located<br />

within the Peoria and Bloomingt<strong>on</strong>/Normal areas. Characteristics being observed are laneage, ADT, curb radius, intersecti<strong>on</strong> skew, right turn skew<br />

(from car placed at appropriate locati<strong>on</strong>), speed limit, right turn channelizati<strong>on</strong>, intersecti<strong>on</strong> c<strong>on</strong>figurati<strong>on</strong>, right turn downstream characteristics,<br />

angle required to view downstream traffic, and others.<br />

Task 4. Collect and Analyze Operati<strong>on</strong>al and Traffic C<strong>on</strong>flict Data<br />

More after data will be collected beginning in May 2012.<br />

Task 5. Collect and Analyze Traffic Crash Data<br />

A statewide traffic crash query was c<strong>on</strong>ducted to identify locati<strong>on</strong>s with 5 or more right-turn related crashes in 2009 and 2010.<br />

99 approaches from 2009 and 104 approaches from 2010 were determined to have five or more right-turn related crashes. A total of 131 unique<br />

approaches from both the 2009 and 2010 query were selected for further analysis.<br />

The geometric characteristics, including locati<strong>on</strong>, operati<strong>on</strong>, traffic c<strong>on</strong>trol, laneage, intersecti<strong>on</strong> skew, right-turn skew, volumes, speed limits,<br />

channelizati<strong>on</strong>, auxiliary lanes, right-turn downstream characteristics, pedestrian informati<strong>on</strong>, and other relative informati<strong>on</strong> was gathered for all<br />

131 unique approaches. A site specific crash analysis will also be c<strong>on</strong>ducted for these locati<strong>on</strong>s to c<strong>on</strong>firm the results. At the next progress meeting<br />

in April, a list of locati<strong>on</strong>s will be presented so that the panel can select a sample for the research team to investigate further.<br />

The research team currently has access to crash data through October 2011. Crash data for the before and part of the after periods for those Peoria<br />

area sites that have already had improvements installed will begin to be collected and analyzed in the coming m<strong>on</strong>ths.<br />

Task 6. Mid-Project and <str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> Meetings<br />

The first mid-project meeting will take place in April 2012. The findings from the initial statewide traffic crash queries will be presented and a list<br />

of sites to investigate further will be established.<br />

Anticipated Work Next Quarter:<br />

Task 2. Literature Review<br />

Draft summaries of the literature review will be prepared next quarter and will be used to establish a secti<strong>on</strong> of the final report.<br />

Task 3. Identify Candidate C<strong>on</strong>trol Sites and Finalize Experimental Plans<br />

The selecti<strong>on</strong> of c<strong>on</strong>trol sites for the crash analysis will be finalized. The experimental plans have already been finalized.<br />

Page 2 of 3<br />

Task 4. Collect and Analyze Operati<strong>on</strong>al and Traffic C<strong>on</strong>flict Data<br />

Additi<strong>on</strong>al video data will be collected. We will begin to analyze the data for various MOE's including traffic c<strong>on</strong>flicts, delay, pedestrian c<strong>on</strong>flicts,<br />

right turning driver behaviors, traffic volumes, headway, and gap acceptance.<br />

Task 5. Collect and Analyze Traffic Crash Data<br />

Once the TRP has reviewed and finalized the list of locati<strong>on</strong>s to be included in the c<strong>on</strong>tributing factor study, site specific crash analysis will be<br />

c<strong>on</strong>ducted for these locati<strong>on</strong>s.<br />

The research team currently has access to crash data through May 2011 and is working <strong>on</strong> obtaining June thru October of 2011. Crash data for the<br />

87

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!