<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Project Title: Green Friendly Best <str<strong>on</strong>g>Management</str<strong>on</strong>g> Practices (BMP) for Interstate<br />

Rest Areas - Phase 2<br />

QPR Author Name: Khaled El-Rayes<br />

Teleph<strong>on</strong>e: 217-265-0557 Project Completed: 65%<br />

Percent Time Used to Date: 100 %<br />

<strong>Research</strong> <str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong><br />

<str<strong>on</strong>g>Report</str<strong>on</strong>g><br />

Ending MARCH 2012<br />

Last Updated: 6/22/2012 <str<strong>on</strong>g>Report</str<strong>on</strong>g> Generated:6/27/2012<br />

TRP Chair Approved: 2/1/2012<br />

Project Number: R27-103 Functi<strong>on</strong> Code: R27-103<br />

Estimated Dates<br />

Fiscal Year: 2012<br />

Project Status: On Schedule<br />

(green)<br />

Task Title Start Complete <strong>Progress</strong> this<br />

Quarter<br />

Task 1: C<strong>on</strong>duct Surveys of State DOTs and Investigate Feasibility of Metering<br />

Systems<br />

Completed<br />

1/1/2011 5/31/2011 No Yes<br />

Task 2: C<strong>on</strong>duct On-site Assessments of Six Selected Rest Areas 3/1/2011 8/31/2011 No Yes<br />

Task 3: Identify Promising Green Friendly Best <str<strong>on</strong>g>Management</str<strong>on</strong>g> Practices 9/1/2011 2/29/2012 No Yes<br />

Task 4: Analyze the Ec<strong>on</strong>omic and Envir<strong>on</strong>mental Impact of BMPs 12/1/2011 2/29/2012 No Yes<br />

Task 5: Develop Practical Decisi<strong>on</strong> Support Tool for Optimizing Upgrade<br />

Decisi<strong>on</strong>s<br />

1/1/2012 8/31/2012 No No<br />

Task 6: Develop Recommendati<strong>on</strong>s for Selected Rest Areas 8/1/2012 10/31/2012 No No<br />

Project Start Date: 2/28/2011 Original Project End Date: Number of Extenti<strong>on</strong>s: 0 Current Project End Date: 12/31/2012<br />

Original Project Budget: $220000 Number of Budget Changes: 0 Current Project Budget: $220000<br />

Total Funds Expended this Quarter: $0 Total Project Expenses to Date: $0 Total % Of Budget Spent To Date: 0%<br />

Project Descripti<strong>on</strong>:<br />

Energy costs have risen at the Rest Areas and are expected to increase over time. This means we can expect both higher visitati<strong>on</strong> numbers and<br />

increased annual energy bills for these sites. Any preventative measures, especially in the area of "Green Friendly" techniques, that will save m<strong>on</strong>ey<br />

and at the same time show our commitment by the State to be more envir<strong>on</strong>mentally c<strong>on</strong>scious would be very beneficial and well received.<br />

The research tasks of this project would allow us to study six rest areas that have the highest energy bills and determine what modificati<strong>on</strong>s could<br />

be made from the simple to the complex for generating energy savings (dollars) while being "Green Friendly" (envir<strong>on</strong>mentally aware). When<br />

added to the fact that this would take place at state facilities that are now experiencing nearly 40 milli<strong>on</strong> visitors a year, this would go a l<strong>on</strong>g way to<br />

improve the fiscal and envir<strong>on</strong>mental image of <strong>Illinois</strong> <strong>on</strong> both a state and nati<strong>on</strong>al level.<br />

Keywords: Green, BMP, rest area<br />

Principal Investigator:<br />

Name: Khaled El-Rayes Organizati<strong>on</strong> / Address<br />

Teleph<strong>on</strong>e: 217-265-0557<br />

Email: elrayes@illinois.edu<br />

UIUC<br />

3112 Newmark Civil Engineering Laboratory 205 N. Mathews Ave. Urbana, IL 61801<br />

Co-Investigator:<br />

Name: Liang Liu Organizati<strong>on</strong> / Address<br />

UIUC<br />

Teleph<strong>on</strong>e: 217-333-6951<br />

Email: lliu1@uiuc.edu<br />

<strong>Research</strong> Student Team Members: Moatassem Abdallah<br />

Technical Review Panel:<br />

Members Teleph<strong>on</strong>e Email Address<br />

Craig Mitckes (Chair) 217-782-2984 Craig.Mitckes@illinois.gov<br />

74<br />