<str<strong>on</strong>g>Quarterly</str<strong>on</strong>g> <strong>Progress</strong> <str<strong>on</strong>g>Report</str<strong>on</strong>g><br />
<strong>Research</strong> Student Team Members: Carlos Bulnes Garcia, Joseph M<strong>on</strong>ical<br />
Technical Review Panel:<br />
Members Teleph<strong>on</strong>e Email Address<br />
Joe Vespa (Chair) 217-782-3479 Joseph.Vespa@illinois.gov<br />
Matt Sunderland 217-557-9035 Matthew.Sunderland@illinois.gov<br />
Tom Ripka 217-785-4495 Thomas.Ripka@illinois.gov<br />
Stephanie Dobbs 217-251-6036 Stephanie.Dobbs@illinois.gov<br />
Dan Salsinger 847-899-9965 Dans@ero-tex.net<br />
Brian Pfeifer 217-492-4281 Brian.Pfeifer@FHWA.Dot.Gov<br />
Janis Piland 217-492-4989 Janis.Piland@FHWA.Dot.gov<br />
Meeting Dates - Minutes Available?<br />
8/17/2011 - Yes 2/16/2012 - Yes<br />
<strong>Progress</strong> & Significant Results This Quarter:<br />
1. Testing protocol and product evaluati<strong>on</strong> for ditch checks: Tested 3D Disto for use in quantifying channel topographical changes upstream and<br />
downstream of ditch checks during product evaluati<strong>on</strong>.<br />
2. Testing protocol for inlet protecti<strong>on</strong>: Began literature review and design of testing protocol for three types of inlets: ditch, flared-end, and curb.<br />
Acquired currently used BMP protecti<strong>on</strong> products for all three types of inlets to use in benchmark evaluati<strong>on</strong>.<br />
Anticipated Work Next Quarter:<br />
1. Testing protocol and product evaluati<strong>on</strong> for ditch checks: Implement selected testing protocol for ditch checks and benchmark current products<br />
used for IDOT projects.<br />
2. Testing protocol for inlet protecti<strong>on</strong>: Complete literature review and evaluati<strong>on</strong> protocol for three inlet types and submit to TRP for review and<br />
approval.<br />
Project Impediments & Recommended Soluti<strong>on</strong>s:<br />
Deliverables and Implementati<strong>on</strong> Strategy:<br />
Last Updated: 6/22/2012<br />
Approved By TRP Chair: 2/16/2012<br />