13.02.2013 Views

sejal architectural glass limited - Securities and Exchange Board of ...

sejal architectural glass limited - Securities and Exchange Board of ...

sejal architectural glass limited - Securities and Exchange Board of ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Brief description <strong>of</strong> the Processes<br />

Our Company processes its various <strong>glass</strong> products using the following processes as<br />

described briefly:<br />

a) Insulating <strong>glass</strong> Process<br />

Process <strong>and</strong> its description<br />

97<br />

As per customer’s requirement, the<br />

<strong>glass</strong>es are cut to size <strong>and</strong> further<br />

processed <strong>and</strong> are made ready for<br />

insulation. Then, the <strong>glass</strong>es are<br />

washed <strong>and</strong> dried in the washing<br />

section <strong>of</strong> the IG line.<br />

The 1 st <strong>glass</strong> <strong>of</strong> the IGU moves upto<br />

the pressing section <strong>and</strong> is picked up<br />

<strong>and</strong> kept in position for assembly in<br />

the press. The 2 nd <strong>glass</strong> after drying<br />

moves to frame positioning. The<br />

spacer frame required for the<br />

insulating <strong>glass</strong> is assembled in the<br />

separated process which includes<br />

cutting, bending, joining, filing with<br />

desiccant or molecular sieve <strong>and</strong><br />

applying <strong>of</strong> primary seal which is<br />

Polyiso Butylene.<br />

Now the ready spacer frame is place<br />

on the second <strong>glass</strong> with spacing as<br />

specified by the user. The 2 nd <strong>glass</strong><br />

with the frame now moves into the<br />

press where it is assembled with the<br />

first <strong>glass</strong>.<br />

This assembled <strong>glass</strong> then moves to<br />

the secondary sealing station.<br />

Depending upon the specification<br />

either polysulphide or silicone is<br />

applied around the periphery <strong>of</strong> the<br />

<strong>glass</strong>. This secondary sealant<br />

provides the necessary bonding<br />

between the two <strong>glass</strong>es, the spacer<br />

frame <strong>and</strong> the primary sealant.<br />

The <strong>glass</strong>es are then stored on racks<br />

for curing <strong>of</strong> the sealant <strong>and</strong> then<br />

moves to the dispatch section.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!