OPF Options: Common Options<br />

The OPF Dialog, Common Options page displays general options associated with the OPF solution. The<br />

display contains the following fields:<br />

©2011 <strong>PowerWorld</strong> Corporation<br />

Objective Function<br />

Allows a choice of solving the LP using either a minimum cost or a minimum control change objective<br />

function.<br />

OPF Reserves Options<br />

These options are only available with the OPF Reserves add-on.<br />

Include OPF Reserve Requirements<br />

Check this box to include OPF reserve constraints in the OPF calculation.<br />

Use a Single Control for Up/Down Regulation<br />

Check this box to use a single bidirectional control for regulating reserve up or down. A unit will<br />

provide the same amount of regulating reserve up or down.<br />

Disable All Phase Shifter Controls<br />

LP Control Variables<br />

Prevents phase shifters from attempting to control devices during the OPF solution.<br />

Disable All Generator MW Controls<br />

Prevents generators from shifting MW output during the OPF solution.<br />

Disable All Load MW Controls<br />

Prevents loads from shifting MW demand during the OPF solution.<br />

Disable Area-toArea MW Transaction Controls<br />

Prevents MW transactions between areas from being dispatched during the OPF solution.<br />

Disable DC Transmission Line MW Controls<br />

Prevents shifting of DC Transmission Line MW transfers during the OPF solution.<br />

Maximum Number of LP Iterations<br />

LP Options<br />

Maximum number of allowable iterations for the LP portion of the LP OPF. How many iterations are<br />

required to obtain a solution depends, among other things, upon the number of breakpoints in the<br />

control cost models. Since each LP iteration can only move from one breakpoint to the next, the<br />

finer the model the more iterations required. However the LP is quite fast so a large number of<br />

iterations can be performed quite quickly. Default = 1000. Select Treat Maximum LP Iterations<br />

Solutions as Valid will treat the maximum number of iteration as a valid solution in the LP OPF.<br />

Phase Shifter Cost ($ / Degree)<br />

Specifies the assumed cost for moving phase shifting transformer taps away from their initial values.<br />

The purpose for this fictitious cost is approximate the cost of actually changing the angle of a phase<br />