Added new Custom Monitoring to the contingency analysis tool. This allows you to setup<br />

monitoring of a field of a specific object (or all objects of a specific type) and report these<br />

fields values as limit violations in the contingency analysis. Appropriate advanced filters can<br />

also be specified so that violations are only reported if specified pre-contingency or postcontingency<br />

conditions are met.<br />

"Close with Breakers" action is now available. This will attempt to identify breakers that can<br />

be closed in order to energize a device rather than changing the status of the device itself.<br />

Fault Analysis<br />

Added total fault impedance field to Bus, to store the Thevenin R and X needed to calculate<br />

the total fault X/R ratio.<br />

Added ability to define a list of Fault Definitions (similar to a list of contingency definitions).<br />

These faults can then be processed as a batch and the results of Fault Current Magnitude<br />

and Angle, and Thevenin impedance at the fault can be automatically saved for each fault.<br />

File Formats<br />

When using the Present Topological Differences from Base Case tool, added the ability to<br />

save the removed elements in the EPC file format using status values of -4.<br />

Modified the writing of GE EPC file so that Multi-Terminal DC converters will write out the<br />

"aloss" parameter in a manner consistent with how the EPCL file mtTAP.p expects to ensure<br />

the EPCL operates appropriate for WECC data files.<br />

When reading from an EPC file, added the reading of the area and zone designation of a GE<br />

branch and transformer.<br />

Added a log warning message when appending an EPC file which causes a transformer<br />

branch to be converted to a normal branch.<br />

When loading in EPC files and the latitude and longitude values are both zero, both entries<br />

will be ignored as invalid.<br />

When appending an EPC file with a scheduled voltage for a bus, the voltage setpoints for<br />

switched shunts and generators that are regulating this bus are now properly updated.<br />

Modified how appending an existing three-winding transformer is handled if a new threewinding<br />

transformer is entered which uses a bus number which is already used as a star<br />

bus by another transformer. This is not allowed and a new bus number will automatically be<br />

chosen.<br />

When appending to an existing case using an EPC file, any new branches that are created<br />

are now flagged as having just been added. This flag is then used as part of the preprocessing<br />

feature in the power flow solution to automatically estimate appropriate voltage<br />

magnitudes and angles for any existing or new buses that become newly energized.<br />

Modified the writing of PTI RAW files so that switched shunt records always write out at<br />

least one block. If none exists, a single block with 1 step and size equal to the present MVar<br />

output is written.<br />

When appending using the RAW file format, we now populate a field to say whether an<br />

object is new or modified while reading.<br />

Added an option when saving a RAW file to append object labels as comments to the end of<br />

data records.<br />

When appending to an existing case using a RAW file, any new branches that are created<br />

are now flagged as having just been added. This flag is then used as part of the preprocessing<br />

feature in the power flow solution to automatically estimate appropriate voltage<br />

magnitudes and angles for any existing or new buses that become newly energized.<br />

When loading the hdbexport file, modified to automatically add two labels to each<br />

transmission line. One label starts with the "from" substation name and the other label<br />

starts with the "to" substation name.<br />

Modified to add additional bus labels when reading the MEAS records in the Areva CSV file.<br />

At the end of reading in an hdbexport CSV file, if any CBTyp values were encountered that<br />

were not recognized a dialog box will appear prompting the user to designate a Branch<br />