RepoRt on - BNP Paribas
RepoRt on - BNP Paribas
RepoRt on - BNP Paribas
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
since it has the most knowledge about<br />
transacti<strong>on</strong>s and clients. the procedure<br />
classifies projects according to their importance,<br />
ensuring the most sensitive<br />
<strong>on</strong>es are brought to the attenti<strong>on</strong> of<br />
cib’s management before a decisi<strong>on</strong><br />
is taken. these projects are systematically<br />
managed by a specific transacti<strong>on</strong>s<br />
approval committee. this committee<br />
existed before the equator Principles<br />
were formally adopted, and deals with<br />
excepti<strong>on</strong>al transacti<strong>on</strong>s. it analyses aspects<br />
of the transacti<strong>on</strong> other than its<br />
financial viability, focusing <strong>on</strong> excepti<strong>on</strong>al<br />
risks that need to be validated<br />
by senior management.<br />
to help project financing staff with categorising<br />
the equator Principles, a sustainable<br />
finance tool is used. this tool is<br />
also used by other signatory banks, and<br />
has been tailored to bnP <strong>Paribas</strong>. it identifies<br />
envir<strong>on</strong>mental and social issues in<br />
specific sectors, and provides a guide for<br />
categorising them. it offers possible soluti<strong>on</strong>s<br />
to mitigate identified envir<strong>on</strong>mental<br />
and social risks, as well as recommendati<strong>on</strong>s<br />
to be passed <strong>on</strong> to the client.<br />
all key participants in project financing<br />
have received specific training. sessi<strong>on</strong>s<br />
have taken place in Paris, new york and<br />
singapore. in all, 163 staff have taken<br />
part in training, including around 90% of<br />
project finance staff, al<strong>on</strong>g with others<br />
involved in the transacti<strong>on</strong> approval<br />
process. additi<strong>on</strong>al sessi<strong>on</strong>s will be organised<br />
as required.<br />
in additi<strong>on</strong>, an intranet tool has been<br />
developed to disseminate knowledge<br />
of the equator Principles, including informati<strong>on</strong><br />
for resolving complex problems<br />
and a legal glossary to be used to draft<br />
loan documentati<strong>on</strong>, particularly the<br />
envir<strong>on</strong>mental and social secti<strong>on</strong>s.<br />
in 2009, 58 transacti<strong>on</strong>s were examined.<br />
88% were rated in categories b or c (with<br />
limited or insignificant envir<strong>on</strong>mental<br />
and social impact). 12% were rated in<br />
category a, showing a potentially material<br />
negative impact, but also adequate<br />
mitigati<strong>on</strong> prospects according to the<br />
equator Principles categorisati<strong>on</strong>.<br />
a detailed review covering the implementati<strong>on</strong><br />
of the equator Principles and<br />
annual reporting documents relating to<br />
transacti<strong>on</strong>s can be accessed at the<br />
following web address:<br />
http://www.bnpparibas.com/en/<br />
sustainable-development/equatorprinciples.asp<br />
the acquisiti<strong>on</strong> of a 75% stake in fortis<br />
banque became effective <strong>on</strong> 12 may<br />
2009. bnP <strong>Paribas</strong> fortis’ acceptance<br />
of the equator Principles was c<strong>on</strong>firmed<br />
after the acquisiti<strong>on</strong>. a separate reporting<br />
document is included in the csr<br />
report and can be accessed at the<br />
bnP <strong>Paribas</strong> fortis website:<br />
http://www.fortisbank.com/en/<br />
corporateresp<strong>on</strong>sibility/csr_reports.asp<br />
pRoJects by geogRAphicAl Regi<strong>on</strong><br />
3% africa<br />
5% asia<br />
9% australia<br />
10% middle east<br />
16% north america<br />
21% south america<br />
36% europe<br />
breakdoWn oF proJeCts bY CategorY and seCtor<br />
CATEGORy A<br />
CATEGORy B<br />
CATEGORy C<br />
Number of projects<br />
25<br />
20<br />
15<br />
10<br />
5<br />
0<br />
Mining<br />
79 <str<strong>on</strong>g>RepoRt</str<strong>on</strong>g> <strong>on</strong> CoRpoRate SoCial and enviR<strong>on</strong>mental ReSp<strong>on</strong>Sibility<br />
Infrastructure<br />
Petrochemicals<br />
Oil and gas<br />
Thermal power stati<strong>on</strong>s<br />
Power transmissi<strong>on</strong><br />
Renewable energies