- Page 1 and 2:
Project logo: Priority logo: Projec
- Page 3 and 4:
Paper Session 6 thBALKAN POWER CONF
- Page 5 and 6:
6 thBALKAN POWER CONFERENCE Panel S
- Page 7 and 8:
- WAYS TO MINIMIZE THE GREENHOUSE G
- Page 9 and 10:
BPC 2006 INTRODUCTION • The inter
- Page 11 and 12:
CARBON EMISSIONS TRADING - A NEW WE
- Page 13 and 14:
CARBON EMISSIONS TRADING - A NEW WE
- Page 15 and 16:
PROMOTION OF RENEWABLE RESOURCES
- Page 17 and 18:
NUCLEAR POWER - NOT ONLY AN OPTION,
- Page 19 and 20:
ROMANIAN APPROACH BPC 2006 • In 2
- Page 21 and 22:
ROMANIAN APPROACH BPC 2006 The tren
- Page 23 and 24:
ROMANIAN APPROACH BPC 2006 • The
- Page 25 and 26:
ROMANIAN APPROACH BPC 2006 • Anot
- Page 27 and 28:
CONCLUSIONS BPC 2006 • We conside
- Page 29 and 30:
ioan.manicuta@opcom.ro
- Page 31 and 32:
kategorizicija na hidrogeotermalnit
- Page 33 and 34:
konduktivni hidrogeotermalni sistem
- Page 35 and 36:
Glavni geotermalni poliwa vo Makedo
- Page 37 and 38:
metodi za odreduvawe na geotermalni
- Page 39 and 40:
U~estvo na poedine~ni energenti vo
- Page 41 and 42:
PREPORAKI so relativno mali vlo`uv
- Page 43 and 44:
6th Balkan Power Conference Romania
- Page 45 and 46:
Electricity are traded separately f
- Page 47 and 48:
Support system for E-RES E RES Fixe
- Page 49 and 50:
Central Central Command Command and
- Page 51 and 52:
CGCMO determines: determines determ
- Page 53 and 54:
10.000 10.000 9.000 9.000 8.000 8.0
- Page 55 and 56:
50 50 45 45 40 40 35 35 30 30 25 25
- Page 57 and 58:
Centralized Green Certificates Mark
- Page 59 and 60:
90 90 80 80 70 70 60 60 50 50 40 40
- Page 61 and 62:
Thank you for your attention Ghergh
- Page 63 and 64:
ABSTRACT Biomass is one of the very
- Page 65 and 66:
INTRODUCTION -Biogas is a mixture o
- Page 67 and 68:
BENEFITS RESULTING FROM THE USE OF
- Page 69 and 70:
ELECTRICAL ENERGY AND BIOGAS When b
- Page 71 and 72:
BIOGAS AS RENEWABLE SOURCE IN ISOLA
- Page 73 and 74:
BIOGAS AS RENEWABLE SOURCE IN ISOLA
- Page 75 and 76:
BIOGAS AS RENEWABLE SOURCE IN ISOLA
- Page 77 and 78:
Renewable Energy in Western Region
- Page 79 and 80:
Renewable Energy in China • China
- Page 81 and 82:
Western Region of China • The pot
- Page 83 and 84:
WRC : Area and Population • The t
- Page 85 and 86:
Geographical Conditions of WRC •
- Page 87 and 88:
Renewable Potentials: Hydro Power
- Page 89 and 90:
Wind Energy • China has rich wind
- Page 91 and 92:
Geothermal Power Generation in Tibe
- Page 93 and 94:
Barriers to RES Development in Chin
- Page 95 and 96: Financing Problems • Due to low e
- Page 97 and 98: Financing of RES Projects in Tibet
- Page 99 and 100: Wind and Biomass Projects • Compa
- Page 101 and 102: The geothermal energy • Market po
- Page 103 and 104: Introduction • Croatia, now for a
- Page 105 and 106: Solar and wind power a) b) c) d) Un
- Page 107 and 108: Biomass, hydro and geothermal energ
- Page 109 and 110: Conclusion The DEG based on RES in
- Page 111 and 112: ADEG database Thank you for you att
- Page 113 and 114: Presentation outline 1. Guarantees
- Page 115 and 116: Life Cycle of a TGC 1. 2. 3. ISSUE
- Page 117 and 118: RELATION BETEEN RECS AND GoO • Go
- Page 119 and 120: Use of TGCs and GoOs • Green elec
- Page 121 and 122: Introduction of RECS in SEE Option
- Page 123 and 124: Contact information Energy Agency o
- Page 130 and 131: Fig 1. Principal met station locati
- Page 132 and 133: Map around Banatski Karlovac met st
- Page 138: Wind mast data 40 m Weibull fit Com
- Page 142: Table II Predicted Deliblatska Peš
- Page 145: Table IV Predicted wind at Deliblat
- Page 151 and 152: The possibility of wind climate pre
- Page 155 and 156: Fig 9 Predicted wind at Dolovo wind
- Page 160: Helimaks wind must position Closest
- Page 165: Predicted wind characteristics at Z
- Page 181 and 182: Rošijana has the place for the res
- Page 183 and 184: Appliance Number of items Size per
- Page 186 and 187: P [kW] 4.0 3.5 3.0 2.5 2.0 1.5 1.0
- Page 188 and 189: E [kWh]/day 50 45 40 35 30 25 20 15
- Page 192 and 193: -Maintenance crew consists of 2 to
- Page 194 and 195: Lat 44.9 Lon 21.05 Average Daily Ra
- Page 196 and 197:
Annual Energy Production Estimate E
- Page 200 and 201:
Eco house Rošijana is planned to b
- Page 203 and 204:
Potential for PV application in the
- Page 205 and 206:
Potential for PV application in the
- Page 207 and 208:
Potential for PV application in the
- Page 209 and 210:
Potential for PV application in the
- Page 211 and 212:
Potential for PV application in the
- Page 213 and 214:
Potential for PV application in the
- Page 215 and 216:
Potential for PV application in the
- Page 217 and 218:
Potential for PV application in the
- Page 221 and 222:
Potential for PV application in the
- Page 223 and 224:
2) Odrediti potrebe za strujom (naj
- Page 225 and 226:
Cijena PV sistema (za osnovne potre
- Page 227:
Cijena PV sistema ovisi, dakle, o p
- Page 230 and 231:
In selected house, Mr Jovo Ovluka l
- Page 232:
Potential for PV application in the
- Page 235 and 236:
Contents: • Introduction • Stud
- Page 237 and 238:
Study case Fezlievo Bacilo • Geog
- Page 239 and 240:
Load identification Appliance Size
- Page 241 and 242:
Solar radiation data Monthly averag
- Page 243 and 244:
Cost analysis and financial summary
- Page 245 and 246:
Cost analysis and financial summary
- Page 247 and 248:
Conclusion • The year to positive
- Page 249 and 250:
Contents • I. Introduction • II
- Page 251 and 252:
Mass implementation of Solar Therma
- Page 253 and 254:
B. Location • “Fezlievo Bachilo
- Page 255 and 256:
C. Large Solar Water Heating System
- Page 257 and 258:
Costs • The investment costs: est
- Page 259 and 260:
Cumulative cash flow
- Page 261 and 262:
III. Conclusion • The economic in
- Page 263 and 264:
Thank You For Your Attention! Maced
- Page 266 and 267:
COSTS STRUCTURE FOR WIND PLANT PROJ
- Page 268 and 269:
TRENDS IN AVERAGE PRICES AND IN AVE
- Page 270 and 271:
Model for calculating electric ener
- Page 272 and 273:
Anemometer post Target site Village
- Page 274 and 275:
Estimated electricity production fo
- Page 276 and 277:
Electric energy production costs fo
- Page 278 and 279:
EXPLORATION OF WIND ENERGY POTENTIA
- Page 280 and 281:
Introduction With the installation
- Page 282 and 283:
II Wind Energy Atlas The Wind Atlas
- Page 284 and 285:
Site Selection The analysis done th
- Page 286 and 287:
Site Selection The field inspection
- Page 290:
Site 10 - Ranovec Mountain, Bogdanc
- Page 294:
Site 20 - Bogoslovec, Sveti Nikole
- Page 297 and 298:
Measurement Equipment For the reali
- Page 299 and 300:
Conclusion The paper explains lates
- Page 301 and 302:
Croatia: RES POTENTIALS (RE SOURCES
- Page 303 and 304:
Croatia presently utilizes much les
- Page 305 and 306:
Thermal from Solar - Croatia: Poten
- Page 307 and 308:
CROATIA - Current situation in Powe
- Page 309 and 310:
24 22 20 18 16 14 12 10 % 8 6 4 2 0
- Page 311 and 312:
Presently: Investments in potential
- Page 313 and 314:
Reforms in Energy Sector in Croatia
- Page 315 and 316:
Environmental Protection and Energy
- Page 317 and 318:
In the procedure for acceptance: Se
- Page 319 and 320:
Subsidy - Financial Support Economi
- Page 321 and 322:
Decree on minimum share of electric
- Page 323 and 324:
MW 600 400 200 Timeframe RES-E Fors
- Page 326 and 327:
Technical challenges associated wit
- Page 328 and 329:
Introduction Grid integration conc
- Page 330 and 331:
Impacts on system operating costs W
- Page 332 and 333:
Power imbalances Power imbalances
- Page 334 and 335:
Transmission planning There is hig
- Page 336 and 337:
Wind power curtailment In most Eur
- Page 338 and 339:
Conclusions The main technical cha
- Page 340 and 341:
1. Introduction Content 2. The exam
- Page 342 and 343:
Selected country-specific RES techn
- Page 344 and 345:
2. The examined RES technologies 2.
- Page 346 and 347:
Costs in Reduction Reference Increa
- Page 348 and 349:
Reference option: Lignite fueled po
- Page 350 and 351:
3. Marginal cost of the prospective
- Page 352 and 353:
Cost ($/tonne) 450 400 350 300 250
- Page 354 and 355:
4.2 Private and public decision-mak
- Page 356 and 357:
5. Conclusion The total achievable
- Page 358 and 359:
Hrvatska Elektroprivreda d.d. Zagre
- Page 360 and 361:
Hrvatska Elektroprivreda d.d. Intro
- Page 362 and 363:
Hrvatska Elektroprivreda d.d. HEP G
- Page 364 and 365:
Hrvatska Elektroprivreda d.d. Power
- Page 366 and 367:
Hrvatska Elektroprivreda d.d. Times
- Page 368 and 369:
Hrvatska Elektroprivreda d.d. Busin
- Page 370 and 371:
Hrvatska Elektroprivreda d.d. Promo
- Page 372 and 373:
Hrvatska Elektroprivreda d.d. Europ
- Page 374 and 375:
Hrvatska Elektroprivreda d.d. Zagre
- Page 376 and 377:
Hrvatska Elektroprivreda d.d. Concl
- Page 378 and 379:
Hrvatska Elektroprivreda d.d. Zagre
- Page 380 and 381:
Electricity from renewables • Bri
- Page 382:
The regulator’s role • Responsi
- Page 385 and 386:
Kyoto Protocol‘s Flexible Mechani
- Page 387 and 388:
JI and CDM: principle Joint Implem
- Page 389 and 390:
Who buys CERs and ERUs? Annex I -
- Page 391 and 392:
Booming JI and CDM market 195 CDM
- Page 393 and 394:
JI/CDM: Good opportunities for the
- Page 395 and 396:
Example: Hydro Power JI Project in
- Page 397 and 398:
And the future? West Balkan countri
- Page 399 and 400:
1. The timing It took more than a
- Page 401 and 402:
3. The main provisions I New stric
- Page 403 and 404:
5. The new tariffs and tax exemptio
- Page 405 and 406:
7. The way forward The new Law is y
- Page 407 and 408:
content • EGL AG / market overvie
- Page 409 and 410:
local presence. EGL Headquarters an
- Page 411 and 412:
introduction in trading Co2 overvie
- Page 413 and 414:
prices- & volumes development for E
- Page 415 and 416:
correlation CO2 - Gas (National Bal
- Page 417 and 418:
market mechanism • spot: delivery
- Page 419 and 420:
ehaviour of the market participants
- Page 421 and 422:
EUAA one uniform trading good in Eu
- Page 423 and 424:
the end www.egl-emissions.com www.e
- Page 425 and 426:
difference in per capita GDP betwee
- Page 427 and 428:
and Natural Gas demand forecast).He
- Page 429 and 430:
methane, such as ethane, propane, a
- Page 431 and 432:
Structural, Morphological and Optic
- Page 433 and 434:
Fig.5. Micrograph obtained from a s
- Page 435 and 436:
IV. ACKNOWLEDGMENT The authors grat
- Page 437 and 438:
A similar program is scheduled to b
- Page 439 and 440:
with reality. Fewer people had been
- Page 441 and 442:
Abstract Romanian Green Certificate
- Page 443 and 444:
energy sources that are eligible to
- Page 445 and 446:
RON 170 160 150 140 130 120 110 100
- Page 447 and 448:
Energetic Efficiency of Geothermal
- Page 449 and 450:
een imported to. biomasses energy i
- Page 451 and 452:
decentralized energy generation tha
- Page 453 and 454:
existence of the legislation that p
- Page 455 and 456:
find its niche most easily for user
- Page 457 and 458:
B. RECS Certificates The best known
- Page 459 and 460:
prescribed quotas for suppliers. Th
- Page 461 and 462:
Renewable Energy in Western China -
- Page 463 and 464:
through a specific levy. Pure tende
- Page 465 and 466:
mainly used as hot water in industr
- Page 467 and 468:
B. Wind Turbine Characteristics A w
- Page 469 and 470:
equirements, manufacturers of varia
- Page 471 and 472:
wind power plant Stupišće on the
- Page 473 and 474:
advantage. Due to remoteness and lo
- Page 475 and 476:
ecommended) in unheated part of the
- Page 477 and 478:
additionally very welcomed in areas
- Page 479 and 480:
2) Production costs (running costs)
- Page 481 and 482:
Fig. 3. Satellite snapshot of wider
- Page 483 and 484:
V. CONCLUSION Based on experience o
- Page 485 and 486:
III. SPECIAL NATURE RESERVE DELIBLA
- Page 487 and 488:
Fig. 8 Position of Rošijana house
- Page 489 and 490:
Abstract-- The experiments were per
- Page 491 and 492:
Fig. 6 Humka Nagula region vector m
- Page 493 and 494:
difference in wind rose as seen fro
- Page 495 and 496:
array for any array orientation, us
- Page 497 and 498:
THE FINANCIAL FEASIBILITY FOR THE S
- Page 499 and 500:
Estimation of Costs for Implementat
- Page 501 and 502:
As shown in figure 1, based on the
- Page 503 and 504:
Sensitivity analysis performed with
- Page 505 and 506:
EXPLORATION OF WIND ENERGY POTENTIA
- Page 507 and 508:
Fig. 1. Wind Resource of Macedonia
- Page 509:
months, probably this period will b