- Page 1 and 2:
Project logo: Priority logo: Projec
- Page 3 and 4:
Paper Session 6 thBALKAN POWER CONF
- Page 5 and 6:
6 thBALKAN POWER CONFERENCE Panel S
- Page 7 and 8:
- WAYS TO MINIMIZE THE GREENHOUSE G
- Page 9 and 10:
BPC 2006 INTRODUCTION • The inter
- Page 11 and 12:
CARBON EMISSIONS TRADING - A NEW WE
- Page 13 and 14:
CARBON EMISSIONS TRADING - A NEW WE
- Page 15 and 16:
PROMOTION OF RENEWABLE RESOURCES
- Page 17 and 18:
NUCLEAR POWER - NOT ONLY AN OPTION,
- Page 19 and 20:
ROMANIAN APPROACH BPC 2006 • In 2
- Page 21 and 22:
ROMANIAN APPROACH BPC 2006 The tren
- Page 23 and 24:
ROMANIAN APPROACH BPC 2006 • The
- Page 25 and 26:
ROMANIAN APPROACH BPC 2006 • Anot
- Page 27 and 28:
CONCLUSIONS BPC 2006 • We conside
- Page 29 and 30:
ioan.manicuta@opcom.ro
- Page 31 and 32:
kategorizicija na hidrogeotermalnit
- Page 33 and 34:
konduktivni hidrogeotermalni sistem
- Page 35 and 36:
Glavni geotermalni poliwa vo Makedo
- Page 37 and 38:
metodi za odreduvawe na geotermalni
- Page 39 and 40:
U~estvo na poedine~ni energenti vo
- Page 41 and 42:
PREPORAKI so relativno mali vlo`uv
- Page 43 and 44:
6th Balkan Power Conference Romania
- Page 45 and 46:
Electricity are traded separately f
- Page 47 and 48:
Support system for E-RES E RES Fixe
- Page 49 and 50:
Central Central Command Command and
- Page 51 and 52:
CGCMO determines: determines determ
- Page 53 and 54:
10.000 10.000 9.000 9.000 8.000 8.0
- Page 55 and 56:
50 50 45 45 40 40 35 35 30 30 25 25
- Page 57 and 58:
Centralized Green Certificates Mark
- Page 59 and 60:
90 90 80 80 70 70 60 60 50 50 40 40
- Page 61 and 62:
Thank you for your attention Ghergh
- Page 63 and 64:
ABSTRACT Biomass is one of the very
- Page 65 and 66:
INTRODUCTION -Biogas is a mixture o
- Page 67 and 68:
BENEFITS RESULTING FROM THE USE OF
- Page 69 and 70:
ELECTRICAL ENERGY AND BIOGAS When b
- Page 71 and 72:
BIOGAS AS RENEWABLE SOURCE IN ISOLA
- Page 73 and 74:
BIOGAS AS RENEWABLE SOURCE IN ISOLA
- Page 75 and 76:
BIOGAS AS RENEWABLE SOURCE IN ISOLA
- Page 77 and 78:
Renewable Energy in Western Region
- Page 79 and 80:
Renewable Energy in China • China
- Page 81 and 82:
Western Region of China • The pot
- Page 83 and 84:
WRC : Area and Population • The t
- Page 85 and 86:
Geographical Conditions of WRC •
- Page 87 and 88:
Renewable Potentials: Hydro Power
- Page 89 and 90:
Wind Energy • China has rich wind
- Page 91 and 92:
Geothermal Power Generation in Tibe
- Page 93 and 94:
Barriers to RES Development in Chin
- Page 95 and 96:
Financing Problems • Due to low e
- Page 97 and 98:
Financing of RES Projects in Tibet
- Page 99 and 100:
Wind and Biomass Projects • Compa
- Page 101 and 102:
The geothermal energy • Market po
- Page 103 and 104:
Introduction • Croatia, now for a
- Page 105 and 106:
Solar and wind power a) b) c) d) Un
- Page 107 and 108:
Biomass, hydro and geothermal energ
- Page 109 and 110:
Conclusion The DEG based on RES in
- Page 111 and 112:
ADEG database Thank you for you att
- Page 113 and 114:
Presentation outline 1. Guarantees
- Page 115 and 116:
Life Cycle of a TGC 1. 2. 3. ISSUE
- Page 117 and 118:
RELATION BETEEN RECS AND GoO • Go
- Page 119 and 120:
Use of TGCs and GoOs • Green elec
- Page 121 and 122:
Introduction of RECS in SEE Option
- Page 123 and 124:
Contact information Energy Agency o
- Page 130 and 131:
Fig 1. Principal met station locati
- Page 132 and 133:
Map around Banatski Karlovac met st
- Page 138:
Wind mast data 40 m Weibull fit Com
- Page 142:
Table II Predicted Deliblatska Peš
- Page 145:
Table IV Predicted wind at Deliblat
- Page 150 and 151:
a) measured by mast sensor b) Predi
- Page 152:
It was found that rounded-off hourl
- Page 156:
c The possibility of wind climate p
- Page 164 and 165:
Wind rose and Weibull velocity dist
- Page 180 and 181:
Future eco house will consists of t
- Page 182 and 183:
The electric load of Rošijana hous
- Page 184:
Water pump 1 2000 2000 00-24 0.5 10
- Page 187 and 188:
P [kW] 4.0 3.5 3.0 2.5 2.0 1.5 1.0
- Page 189:
E [kWh/day] E [kWh/month] January 2
- Page 193 and 194:
- In accordance to power demands sh
- Page 195 and 196:
Grid type - Isolated-grid Peak load
- Page 197:
House and power source (wind genera
- Page 201:
Contribution to development of urba
- Page 204 and 205:
Potential for PV application in the
- Page 206 and 207:
Potential for PV application in the
- Page 208 and 209:
Potential for PV application in the
- Page 210 and 211:
Additional/alternative inland locat
- Page 212 and 213:
Potential for PV application in the
- Page 214 and 215:
Potential for PV application in the
- Page 216 and 217:
Potential for PV application in the
- Page 218:
Potential for PV application in the
- Page 222 and 223:
Lokacija: selo Bušević Available
- Page 224 and 225:
Lokacija: selo Bušević Energy (kW
- Page 226 and 227:
Cijena PV sistema (za osnovne potre
- Page 229 and 230:
FP6 Project RISE (Renewables for Is
- Page 231 and 232:
Potential for PV application in the
- Page 234 and 235:
Estimation of Costs for Implementat
- Page 236 and 237:
Introduction • Preliminary estima
- Page 238 and 239:
Photovoltaic Project Analysis Model
- Page 240 and 241:
Load identification Load (kW) 3,5 3
- Page 242 and 243:
Description of the PV system • Mo
- Page 244 and 245:
Cost analysis and financial summary
- Page 246 and 247:
Cost analysis and financial summary
- Page 248 and 249:
6 Economic and Environmental evalua
- Page 250 and 251:
I. Introduction • Average solar r
- Page 252 and 253:
II Study case (performed under the
- Page 254 and 255:
Hourly Distribution of Global Solar
- Page 256 and 257:
Storage and BOS Characteristics Sto
- Page 258 and 259:
D. Economical Evaluation Annual Ene
- Page 260 and 261:
E. Environmental Evaluation GHG Red
- Page 262 and 263:
• On the other hand, such system
- Page 264:
FEASIBILITY ANALYSIS OF WIND-PLANT
- Page 267 and 268:
TYPICAL COSTS STRUCTURE FOR SMALL W
- Page 269 and 270:
WIND-PLANT ECONOMY available wind
- Page 271 and 272:
Location and orografy given by a sa
- Page 273 and 274:
Wind potential and wind rose estima
- Page 275 and 276:
Following input data are specified
- Page 277 and 278:
SUMMARY • Target location has a g
- Page 279 and 280:
Introduction Over the last ten year
- Page 281 and 282:
Introduction In Macedonia there is
- Page 283 and 284:
Wind Maps The Atlas is consisting o
- Page 285 and 286:
Site selection General site data 25
- Page 287:
Site 7 - Kozuf Mountain has greates
- Page 292:
Site 16 - Sasavarlija, Stip the sit
- Page 296 and 297:
Measurement Campaign The objective
- Page 298 and 299:
Data processing All sensors are sam
- Page 300 and 301:
RES: Investments Opportunities & Re
- Page 302 and 303:
PANEL SESSION: RES: Investments and
- Page 304 and 305:
Electricity from Solar - Croatia: P
- Page 306 and 307:
Renewables now make 20-25% of globa
- Page 308 and 309:
CROATIA - Current situation in Powe
- Page 310 and 311:
% 80 70 60 50 40 30 20 10 0 1988. 1
- Page 312 and 313:
This gloomy situation with RES in C
- Page 314 and 315:
Comparison of politics in Europe re
- Page 316 and 317:
In process of acceptance: Grid Code
- Page 318 and 319:
In the procedure for acceptance: Se
- Page 320 and 321:
Example of Austria regarding % of i
- Page 322 and 323:
Croatian Policy Goals Minimum share
- Page 324:
Arguments for Optimism for Croatia:
- Page 327 and 328:
Contents Introduction Effects of
- Page 329 and 330:
Effects on power system Wind power
- Page 331 and 332: Power quality The location and int
- Page 333 and 334: Power system dynamics If conventio
- Page 335 and 336: Wind forecasting Wind forecasting
- Page 337 and 338: Future research 1. Varying amounts
- Page 339 and 340: International RES Seminar "Promotin
- Page 341 and 342: 1. Introduction • RES technologie
- Page 343 and 344: Economic and environmental evaluati
- Page 345 and 346: Reference option: Lignite fueled po
- Page 347 and 348: 2.2. Wind power plant General input
- Page 349 and 350: Costs in Reduction Reference Increa
- Page 351 and 352: RES technology Geotherm. heat. Econ
- Page 353 and 354: 4. Limiting barriers to RES impleme
- Page 355 and 356: 4.3 Required infrastructure • Lac
- Page 357 and 358: Nevertheless, contributing to susta
- Page 359 and 360: Hrvatska Elektroprivreda d.d. Table
- Page 361 and 362: Hrvatska Elektroprivreda d.d. HEP G
- Page 363 and 364: Hrvatska Elektroprivreda d.d. HEP G
- Page 365 and 366: Hrvatska Elektroprivreda d.d. Legis
- Page 367 and 368: Hrvatska Elektroprivreda d.d. Trend
- Page 369 and 370: Hrvatska Elektroprivreda d.d. Key I
- Page 371 and 372: Hrvatska Elektroprivreda d.d. Renew
- Page 373 and 374: Hrvatska Elektroprivreda d.d. Distr
- Page 375 and 376: Hrvatska Elektroprivreda d.d. Zagre
- Page 377 and 378: Hrvatska Elektroprivreda d.d. Zagre
- Page 379 and 380: Gorazd Škerbinek REGULATORY FRAMEW
- Page 381: RES-E in the Balkans • High poten
- Page 385 and 386: Kyoto Protocol‘s Flexible Mechani
- Page 387 and 388: JI and CDM: principle Joint Implem
- Page 389 and 390: Who buys CERs and ERUs? Annex I -
- Page 391 and 392: Booming JI and CDM market 195 CDM
- Page 393 and 394: JI/CDM: Good opportunities for the
- Page 395 and 396: Example: Hydro Power JI Project in
- Page 397 and 398: And the future? West Balkan countri
- Page 399 and 400: 1. The timing It took more than a
- Page 401 and 402: 3. The main provisions I New stric
- Page 403 and 404: 5. The new tariffs and tax exemptio
- Page 405 and 406: 7. The way forward The new Law is y
- Page 407 and 408: content • EGL AG / market overvie
- Page 409 and 410: local presence. EGL Headquarters an
- Page 411 and 412: introduction in trading Co2 overvie
- Page 413 and 414: prices- & volumes development for E
- Page 415 and 416: correlation CO2 - Gas (National Bal
- Page 417 and 418: market mechanism • spot: delivery
- Page 419 and 420: ehaviour of the market participants
- Page 421 and 422: EUAA one uniform trading good in Eu
- Page 423 and 424: the end www.egl-emissions.com www.e
- Page 425 and 426: difference in per capita GDP betwee
- Page 427 and 428: and Natural Gas demand forecast).He
- Page 429 and 430: methane, such as ethane, propane, a
- Page 431 and 432: Structural, Morphological and Optic
- Page 433 and 434:
Fig.5. Micrograph obtained from a s
- Page 435 and 436:
IV. ACKNOWLEDGMENT The authors grat
- Page 437 and 438:
A similar program is scheduled to b
- Page 439 and 440:
with reality. Fewer people had been
- Page 441 and 442:
Abstract Romanian Green Certificate
- Page 443 and 444:
energy sources that are eligible to
- Page 445 and 446:
RON 170 160 150 140 130 120 110 100
- Page 447 and 448:
Energetic Efficiency of Geothermal
- Page 449 and 450:
een imported to. biomasses energy i
- Page 451 and 452:
decentralized energy generation tha
- Page 453 and 454:
existence of the legislation that p
- Page 455 and 456:
find its niche most easily for user
- Page 457 and 458:
B. RECS Certificates The best known
- Page 459 and 460:
prescribed quotas for suppliers. Th
- Page 461 and 462:
Renewable Energy in Western China -
- Page 463 and 464:
through a specific levy. Pure tende
- Page 465 and 466:
mainly used as hot water in industr
- Page 467 and 468:
B. Wind Turbine Characteristics A w
- Page 469 and 470:
equirements, manufacturers of varia
- Page 471 and 472:
wind power plant Stupišće on the
- Page 473 and 474:
advantage. Due to remoteness and lo
- Page 475 and 476:
ecommended) in unheated part of the
- Page 477 and 478:
additionally very welcomed in areas
- Page 479 and 480:
2) Production costs (running costs)
- Page 481 and 482:
Fig. 3. Satellite snapshot of wider
- Page 483 and 484:
V. CONCLUSION Based on experience o
- Page 485 and 486:
III. SPECIAL NATURE RESERVE DELIBLA
- Page 487 and 488:
Fig. 8 Position of Rošijana house
- Page 489 and 490:
Abstract-- The experiments were per
- Page 491 and 492:
Fig. 6 Humka Nagula region vector m
- Page 493 and 494:
difference in wind rose as seen fro
- Page 495 and 496:
array for any array orientation, us
- Page 497 and 498:
THE FINANCIAL FEASIBILITY FOR THE S
- Page 499 and 500:
Estimation of Costs for Implementat
- Page 501 and 502:
As shown in figure 1, based on the
- Page 503 and 504:
Sensitivity analysis performed with
- Page 505 and 506:
EXPLORATION OF WIND ENERGY POTENTIA
- Page 507 and 508:
Fig. 1. Wind Resource of Macedonia
- Page 509:
months, probably this period will b