Secondary legislation (by-laws) RES (2)<br />

– Tariff System for Electricity Production from RES and Cogeneration<br />

• Working version:..<br />

Type of RES C (HRK)<br />

PV plants, up to 30 kW 3,25<br />

PV, above 30 kW 2,95<br />

Hydroplants 0,73<br />

windplants 0,59<br />

plants on biomass 0,51<br />

geothermal plants 0,66<br />

plants on biogas and liquid bio 0,88<br />

biogas from wastewater treatment 0,22<br />

combination of the above 0,60<br />

other RES (see waves, tides etc. 0,60<br />