21.08.2013 Views

Prva stran - WBC-INCO Net

Prva stran - WBC-INCO Net

Prva stran - WBC-INCO Net

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

II) take into account all levels cumulatively (low confidence<br />

resource available includes both the high and medium<br />

confidence bands).<br />

Fig. 4. Maximum load capacity of potential wind farms (MW), given on<br />

NUTS III level.<br />

Calculated potential of wind units for electricity<br />

generation is technical and does not take into consideration<br />

TABLE I<br />

MAXIMUM LOAD CAPACITY OF POTENTIAL FACILITIES (MW)<br />

recent decision of the Croatian government to ban<br />

construction and planning of all new wind power plants<br />

(together with quarries, warehouses, factories etc.) on<br />

locations that are on islands and less than 1000 m from the<br />

sea (the projects that in the moment of the proclamation of<br />

the decree had already obtained the location permits are<br />

excluded). The act was explained as a measure of protection<br />

of Croatian coastal area. That unfortunately includes some<br />

of the best locations on Croatian islands and along the<br />

Adriatic coast.<br />

Despite good solar potential it is not likely that big solar<br />

power plants will be built in following years in Croatia due<br />

to high cost of these facilities (the graph representing RES<br />

cost – supply curve for 2010 shown on Fig. 7 does not<br />

contain data for big solar thermal power plants or PV due to<br />

high costs of such facilities that exceed chosen upper cost<br />

limit). Except certain number of households and other<br />

buildings that use PV systems, application of the<br />

photovoltaics will be reserved for isolated areas and specific<br />

purposes like telecommunication base stations,<br />

meteorological stations, lighthouses, road signs, public<br />

lightning, different autonomous monitoring systems<br />

(pollutant emission monitoring, forest fire protection,<br />

technical protection of individual facilities etc.).<br />

No County (NUTS III) Hydro Small hydro Windpower PV Biomass Geothermal<br />

I Zagrebačka 39.00 0.80 0 0.007 6.00 0<br />

II Krapinsko-zagorska 0 0 0 0 2.00 0<br />

III Sisačko-moslavačka 0 0 0 0 0 0<br />

IV Karlovačka 40.00 0.52 0 0 8.00 1.67<br />

V Varaždinska 0 0 0 0 2.00 29.37<br />

VI Koprivničko-križevačka 140.00 0 0 0 5.00 1.88<br />

VII Bjelovarsko-bilogorska 0 0 0 0 1.50 13.07<br />

VIII Primorsko-goranska 0 6.77 6.00 0.047 30.50 0<br />

IX Ličko-senjska 383.00 0.19 23.00 0.047 7.50 0<br />

X Virovitičko-podravska 0 0 0 0 0 0<br />

XI Požeško-slavonska 0 1.39 0 0 2.00 0<br />

XII Brodsko-posavska 0 0 0 0 4.00 0<br />

XIII Zadarska 0 6.58 34.95 0.056 0 0<br />

XIV Osječko-baranjska 0 0 0 0 32.00 0<br />

XV Šibensko-kninska 0 7.86 23.10 0.056 0 0<br />

XVI Vukovarsko-srijemska 0 0 0 0 3.00 1.88<br />

XVII Splitsko-dalmatinska 0 2.96 217.15 0.113 4.00 0<br />

XVIII Istarska 0 0 0 0.047 3.00 0<br />

XIX Dubrovačko-neretvanska 63.00 2.21 74.00 0.056 1.00 0<br />

XX Međimurska 0 0 0 0.007 0 0<br />

XXI City of Zagreb 44.00 0 0 0.007 0 0<br />

Total 709.00 29.26 378.20 0.444 111.50 47.87<br />

On the contrary, thermal solar systems for production of<br />

hot water will be used extensively due to their good<br />

economy. For the time being the main obstacle to wider<br />

usage of solar domestic water heating systems is non-<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!