Fig. 8 Position of Rošijana house<br />

Future eco house will consists of the following units:<br />

residential house, workshop house, mechanical house with<br />

the equipment for water supply, artesian well, water pull<br />

and the garden.<br />

VI. LOAD IDENTIFICATION<br />

Rošijana is planned for all over the year activities. It<br />

has the place for the resident family of about four members<br />

responsible for maintenance and operation. Two principle<br />

groups of visitors are considered: hunters and other groups.<br />

The other group includes schoolboys, tourists, researchers,<br />

nature organization, visitors and experts from outside<br />

countries and all other people interested in visiting the<br />

largest sandy area in Europe and its surroundings with<br />

nearby river Danube, Djerdap canyon and large hydropower<br />

station.<br />

The electric load of Rošijana house was calculated<br />

taking into account the following planned data:<br />

Fig. 9 Rošijana site<br />

- The hunting season lasts from 1st. of May to 14th<br />

of February with the highest season in December<br />

and January. Maximum 8 poeple are planned to be<br />

in the house, but this number is in average 3<br />

depending on the season and the day of the week.<br />

- Special two week camps are mostly organized in<br />

July and August with about twenty poeple.<br />

- The education lessons will be organized in<br />

principle from Jun to September.<br />

- All energy needs were calculated based on the<br />

above eco house activities. The expected position<br />

of the wind turbine with respect to the houses is<br />

given in Fig. 11.<br />

(a) Electricity needs<br />

The load data for each month are given in the tables<br />

bellow, as well as the daily load distribution.<br />

The daily data contained in the tables are graphically<br />

illustrated in Fig. 12, while monthly energy distribution is<br />

presented in Fig. 13.<br />

Fig .10 The basis of the objects at Rošijana site<br />

Fig. 11.Position of the wind turbine in Rošijana complex<br />

E [kWh]<br />

4.0<br />

3.5<br />

3.0<br />

2.5<br />

2.0<br />

1.5<br />

1.0<br />

0.5<br />

0.0<br />

0 5 10 15 20<br />

Fig. 12 Daily energy load distribution<br />

time of the day [h]<br />

% (January)<br />

% (August)<br />

4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!