07.03.2014 Views

5800 Refrigerated Sampler Service Guide - Isco

5800 Refrigerated Sampler Service Guide - Isco

5800 Refrigerated Sampler Service Guide - Isco

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>5800</strong> <strong>Refrigerated</strong> <strong>Sampler</strong> <strong>Service</strong> <strong>Guide</strong><br />

Section 2 Sample Delivery System<br />

G<br />

W<br />

B<br />

R<br />

Yel.<br />

B/R<br />

R/B tw.<br />

Figure 2-3 Pump board connections<br />

2. Align the module over the mounting holes and secure it<br />

with the mounting screws, inserting the top three first.<br />

CAUTION<br />

Ensure that all wires are tucked into the pump module compartment<br />

and not caught between the gasket and mounting<br />

surface.<br />

Insert top row<br />

of screws first.<br />

Ensure that wires<br />

are not caught<br />

under gasket.<br />

Figure 2-4 Installing the pump module<br />

3. After all six screws are inserted, torque the screws 1.8 to<br />

2.0 Nm (16 to 18 in-lbs).<br />

4. Install the pump tube.<br />

a. Loosen the Liquid Detector Cover (F) by unscrewing<br />

the large black knob (H).<br />

b. Unlatch the Pump Housing Band (J).<br />

c. Thread the pump tube through the pump. Note that<br />

the short end (inlet) should extend from the top opening.<br />

2-4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!