5800 Refrigerated Sampler Service Guide - Isco
5800 Refrigerated Sampler Service Guide - Isco
5800 Refrigerated Sampler Service Guide - Isco
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>5800</strong> <strong>Refrigerated</strong> <strong>Sampler</strong> <strong>Service</strong> <strong>Guide</strong><br />
Section 4 CPU and Power Supply<br />
Test refrigeration<br />
control input and<br />
outputs<br />
Display refrigerator<br />
temperature<br />
Display PCB<br />
temperature<br />
Display compressor<br />
duty cycle<br />
Display input voltage<br />
Refrigeration/Temperatures<br />
T30<br />
This test outputs two 100ms pulses on each of<br />
the four refrigeration control outputs.<br />
A pulse is output first on the compressor<br />
output (5V on P1-1), then the refrigerator<br />
fan (5V on P1-3), then the cabinet heater<br />
(5V on P1-2). There is a 100ms pause<br />
between each pulse.<br />
Returns OK to indicate completion<br />
T33<br />
Returns OK to indicate completion<br />
This test reads the resistance on the<br />
refrigeration air temperature input (P3-5 and<br />
P3-6) and returns it as a temperature in<br />
degrees C. It then reads the refrigeration<br />
evaporator temperature input (P3-1 and P3-3),<br />
and returns it as a temperature in degrees C on<br />
a new line.<br />
T34<br />
This test reads the temperature from the<br />
on-board temperature sensor and returns this<br />
value in degrees C.<br />
T50<br />
The duty cycle is computed from the state of the<br />
compressor; this data is stored at one-minute<br />
intervals.<br />
Power<br />
T35<br />
This test measures and returns the nominal 12V<br />
input voltage to the board.<br />
Additional input power testing:<br />
Reduce power input at P10. Power Fail alert measured at TP7.<br />
Goes low when 12V power to board falls to about 8 volts.<br />
Measure the current draw of the board from the 12V supply (Power In at U11).<br />
Measure the 5V power at W18 to DGND (W17).<br />
Measure the 3.3V power at P5-1 to DGND (W17).<br />
Measure the -3.3VA power at W9 to AGND (W10).<br />
Display battery<br />
voltage<br />
Display loaded battery<br />
voltage<br />
Table 4-2 CPU Board Functional Tests (Continued)<br />
Function Command Results<br />
T36<br />
This test measures and returns the voltage of<br />
the lithium battery.<br />
T37<br />
This test measures and returns the voltage of<br />
the lithium battery with the 20K resistor loading<br />
the battery.<br />
Returns OK to indicate completion<br />
Returns duty cycle as a percent of ON time<br />
for the compressor over the last 4 hours.<br />
Returns OK to indicate completion<br />
Returns OK to indicate completion<br />
Returns OK to indicate completion<br />
Returns the battery voltage at one second<br />
intervals for 15 seconds.<br />
Returns OK to indicate completion<br />
Additional battery testing:<br />
Measure the standby current draw from the battery.<br />
Remove the 12V power from the board to perform this test. Using a meter that can read down to 0.01 millivolt,<br />
measure this current by measuring the voltage between TP8+ and TP90-. The voltage should be less than 4mV.<br />
4-10