5800 Refrigerated Sampler Service Guide - Isco
5800 Refrigerated Sampler Service Guide - Isco
5800 Refrigerated Sampler Service Guide - Isco
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>5800</strong> <strong>Refrigerated</strong> <strong>Sampler</strong> <strong>Service</strong> <strong>Guide</strong><br />
Section 3 Refrigeration System<br />
a. For 230V units, loosen the screw on the top hold-down<br />
tab to free the harness.<br />
Smooth<br />
Ribbed<br />
115V<br />
230V<br />
Top hold-down<br />
tab<br />
Ribbed<br />
Smooth<br />
Figure 3-14 Condenser fan connections<br />
3. Remove the three lock nuts holding the fan assembly in<br />
place. Remove the fan assembly and vibration cushion.<br />
Lock<br />
nuts (3)<br />
Fan<br />
Drip<br />
tray<br />
Vibration<br />
cushion<br />
Figure 3-15 Removal/replacement of condenser fan<br />
4. Place the new vibration cushion and fan assembly on the<br />
floor of the refrigeration module, aligning the holes in the<br />
base over the threaded mounting studs, and secure with<br />
the three lock nuts.<br />
5. Route the fan harness around the drip tray and connect to<br />
the relay, taking care to connect the ribbed and smooth<br />
wires correctly, as shown in Figure 3-14.<br />
a. For 230V units, also route the harness wires around<br />
the right side of the terminal box and under the top<br />
hold-down tab. Tighten the screw.<br />
6. Replace the terminal cover, taking care not to pinch or bind<br />
any of the wires.<br />
3-18