29.08.2014 Views

Development of Policy, Legal, and Insitutional Framework for - ppiaf

Development of Policy, Legal, and Insitutional Framework for - ppiaf

Development of Policy, Legal, and Insitutional Framework for - ppiaf

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Development</strong> <strong>of</strong> <strong>Policy</strong>, <strong>Legal</strong>, & Institutional <strong>Framework</strong> <strong>for</strong> the PPP Program in Malawi<br />

Final Report<br />

Model Request <strong>for</strong> Qualifications (RFQ)<br />

Independent Power Producer (IPP) Project<br />

Pre-Qualification In<strong>for</strong>mation <strong>and</strong><br />

Instructions to Potential Applicants<br />

1. Scope <strong>of</strong> Bid<br />

1.1. Public Power Company (PPC) hereby invites applications <strong>for</strong> prequalification<br />

from interested parties <strong>for</strong> the generation <strong>and</strong> supply <strong>of</strong> electricity to PPC,<br />

through the development on a Build-Own-Operate (“BOO”) basis the ____ Plant<br />

Project, <strong>of</strong> ____ MW ± 10 % <strong>and</strong> its associated Transmission Line (“Special<br />

Facility”), located in _____ area, Malawi. The plant will be connected via double<br />

phi connection to the existing _____ Substation, or to a future ____ Substation.<br />

1.2. PPC intends to purchase the electric capacity <strong>and</strong> associated energy generated<br />

by the above mentioned Project, which is <strong>of</strong>fered to private sector IPPs to be<br />

selected through a competitive bidding process. The Project’s ___ kV<br />

Transmission Lines <strong>and</strong> associated substation, including expansion bay <strong>of</strong> PPC<br />

existing substation, shall be built by the Developer <strong>and</strong> transferred to PPC as a<br />

special facility.<br />

1.3. PPC intends to prequalify parties to undertake the design, engineering, financing,<br />

procurement, construction, Uniting, operation, <strong>and</strong> maintenance <strong>of</strong> the abovementioned<br />

Project. The period <strong>of</strong> operation shall be not less than ___ years.<br />

2. General<br />

2.1 Prequalification is open to interested parties, either domestic or <strong>for</strong>eign, provided<br />

that in the opinion <strong>of</strong> their auditors they are financially healthy, <strong>and</strong> their financial<br />

statements are prepared in accordance with Generally Accepted Accounting<br />

Procedures.<br />

2.2 The Applicant shall be a party, or parties <strong>for</strong>ming a consortium. Each such party<br />

shall be a properly constituted company, corporation, firm, joint venture or other<br />

legal entity, whether or not having separate legal personality, duly organized <strong>and</strong><br />

existing <strong>and</strong> registered under the laws <strong>of</strong> its country.<br />

2.3 Only Applicants that have been prequalified under the procedure described in<br />

this document will be invited to bid. Applicants meeting or exceeding the<br />

Qualification Criteria specified in this document will be prequalified. Applicants<br />

must continue to meet or exceed the Qualification Criteria at all times during the<br />

tender process. If changes affecting an Applicant or its constituent members,<br />

result in it no longer meeting the Qualification Criteria, the Applicant’s<br />

prequalification shall be terminated.<br />

THE INSTITUTE FOR PUBLIC-PRIVATE PARTNERSHIPS 152

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!