<strong>Development</strong> <strong>of</strong> <strong>Policy</strong>, <strong>Legal</strong>, & Institutional <strong>Framework</strong> <strong>for</strong> the PPP Program in Malawi<br />
Final Report<br />
Model Request <strong>for</strong> Qualifications (RFQ)<br />
Independent Power Producer (IPP) Project<br />
Pre-Qualification In<strong>for</strong>mation <strong>and</strong><br />
Instructions to Potential Applicants<br />
1. Scope <strong>of</strong> Bid<br />
1.1. Public Power Company (PPC) hereby invites applications <strong>for</strong> prequalification<br />
from interested parties <strong>for</strong> the generation <strong>and</strong> supply <strong>of</strong> electricity to PPC,<br />
through the development on a Build-Own-Operate (“BOO”) basis the ____ Plant<br />
Project, <strong>of</strong> ____ MW ± 10 % <strong>and</strong> its associated Transmission Line (“Special<br />
Facility”), located in _____ area, Malawi. The plant will be connected via double<br />
phi connection to the existing _____ Substation, or to a future ____ Substation.<br />
1.2. PPC intends to purchase the electric capacity <strong>and</strong> associated energy generated<br />
by the above mentioned Project, which is <strong>of</strong>fered to private sector IPPs to be<br />
selected through a competitive bidding process. The Project’s ___ kV<br />
Transmission Lines <strong>and</strong> associated substation, including expansion bay <strong>of</strong> PPC<br />
existing substation, shall be built by the Developer <strong>and</strong> transferred to PPC as a<br />
special facility.<br />
1.3. PPC intends to prequalify parties to undertake the design, engineering, financing,<br />
procurement, construction, Uniting, operation, <strong>and</strong> maintenance <strong>of</strong> the abovementioned<br />
Project. The period <strong>of</strong> operation shall be not less than ___ years.<br />
2. General<br />
2.1 Prequalification is open to interested parties, either domestic or <strong>for</strong>eign, provided<br />
that in the opinion <strong>of</strong> their auditors they are financially healthy, <strong>and</strong> their financial<br />
statements are prepared in accordance with Generally Accepted Accounting<br />
Procedures.<br />
2.2 The Applicant shall be a party, or parties <strong>for</strong>ming a consortium. Each such party<br />
shall be a properly constituted company, corporation, firm, joint venture or other<br />
legal entity, whether or not having separate legal personality, duly organized <strong>and</strong><br />
existing <strong>and</strong> registered under the laws <strong>of</strong> its country.<br />
2.3 Only Applicants that have been prequalified under the procedure described in<br />
this document will be invited to bid. Applicants meeting or exceeding the<br />
Qualification Criteria specified in this document will be prequalified. Applicants<br />
must continue to meet or exceed the Qualification Criteria at all times during the<br />
tender process. If changes affecting an Applicant or its constituent members,<br />
result in it no longer meeting the Qualification Criteria, the Applicant’s<br />
prequalification shall be terminated.<br />
THE INSTITUTE FOR PUBLIC-PRIVATE PARTNERSHIPS 152