Final Report<br />
The in<strong>for</strong>mation to be provided, as part <strong>of</strong> the Technical Proposal, shall include amongst<br />
others:<br />
(i)<br />
<br />
<br />
<br />
Design<br />
Applicable st<strong>and</strong>ards <strong>for</strong> design, materials, manufacture, mechanical <strong>and</strong><br />
electrical works, civil <strong>and</strong> structural works, communications, fire protection,<br />
heating <strong>and</strong> ventilation, operation <strong>and</strong> maintenance, <strong>and</strong> all other works to be<br />
undertaken to fulfil the requirements <strong>of</strong> the Model PPA. Such applicable<br />
st<strong>and</strong>ards will be consistent with an efficient operating life <strong>of</strong> the Plant <strong>of</strong> no less<br />
than thirty (30) years.<br />
Indicative Plant Site layout drawings showing locations <strong>of</strong> key features <strong>of</strong> the<br />
proposed Plant including buildings, coal <strong>and</strong> ash h<strong>and</strong>ling facilities, water<br />
facilities, services, interconnection, access roads, as appropriate. Such locations<br />
shall be within the areas designated on the Indicative Plant Site Plan as being<br />
available <strong>for</strong> the particular purposes. The Indicative Plant Site layout drawings<br />
shall nominate the location <strong>of</strong> drainage <strong>and</strong> effluent discharge points. The<br />
location <strong>of</strong> the 150 kV substation <strong>and</strong> 150 kV transmission line route shall be<br />
shown.<br />
The Bidder’s transportation plan <strong>for</strong> transporting plant, equipment <strong>and</strong> materials to the<br />
Plant Site.<br />
(ii)<br />
<br />
<br />
<br />
<br />
<br />
Generating Plant <strong>and</strong> Auxiliaries<br />
Plant shall be br<strong>and</strong> new,<br />
Plant Site civil works including all site utilities <strong>and</strong> services, raising building plat<strong>for</strong>ms,<br />
constructing dykes as necessary <strong>and</strong> constructing effective drainage <strong>and</strong> dewatering<br />
systems to prevent flooding <strong>of</strong> buildings <strong>and</strong> plant facilities.<br />
The Net Dependable Capacity <strong>of</strong> the plant in MW at Site Conditions <strong>and</strong> burning<br />
the coal, proposed by the Bidder. The Net Dependable Capacity, as adjusted <strong>for</strong><br />
differences between ambient conditions <strong>and</strong> Site Conditions, is guaranteed by the<br />
Bidder.<br />
Outline design <strong>of</strong> the Plant’s electrical plant <strong>and</strong> systems, including redundancy<br />
levels to be provided <strong>and</strong> in particular the mode <strong>of</strong> connection to PPC Grid<br />
System.<br />
Outline design <strong>of</strong> Plant auxiliaries, services <strong>and</strong> systems including Coal <strong>and</strong> Ash<br />
h<strong>and</strong>ling system, cooling water system, lube oil, hydraulic oil, service water,<br />
heating <strong>and</strong> ventilation system, fire detection <strong>and</strong> protection system <strong>and</strong> exhaust<br />
systems. Related data, with details <strong>of</strong> equipment redundancy levels, shall be<br />
provided.<br />