<strong>Development</strong> <strong>of</strong> <strong>Policy</strong>, <strong>Legal</strong>, & Institutional <strong>Framework</strong> <strong>for</strong> the PPP Program in Malawi<br />

Final Report<br />

<br />

Details <strong>of</strong> generating plant including:<br />

- Manufacturer, type <strong>and</strong> model <strong>of</strong> each Unit, the number <strong>of</strong> Units<br />

- Start-up times, loading rates <strong>and</strong> other dynamic parameters.<br />

- Steam turbine.<br />

- AVR, exciters including reactive power control <strong>and</strong> related equipment.<br />

- Auxiliary plant <strong>and</strong> accessories.<br />

<br />

(iii)<br />

<br />

<br />

(iv)<br />

<br />

<br />

(v)<br />

<br />

<br />

(vi)<br />

<br />

Confirmation that the proposed Plant would employ proven technology.<br />

Experience reference sheets or similar evidence <strong>of</strong> proven per<strong>for</strong>mance on other<br />

projects shall be provided in respect <strong>of</strong> major plant items.<br />

Water Supply<br />

The water requirements <strong>for</strong> the operation <strong>of</strong> the Plant <strong>and</strong> the water facilities <strong>and</strong><br />

on-site storage to be provided as part <strong>of</strong> the Plant.<br />

Effluent limits <strong>of</strong> segregated wastewater system <strong>and</strong> location <strong>of</strong> effluent<br />

discharge point.<br />

Coal Supply<br />

Choice <strong>of</strong> Coal <strong>and</strong> Coal Supplier <strong>and</strong> the Technical Proposal shall specify,<br />

amongst others, the following:<br />

- Name <strong>and</strong> details <strong>of</strong> the Coal Supplier;<br />

- Location <strong>of</strong> coal mine <strong>and</strong> method <strong>of</strong> transportation to the plant site<br />

- Type <strong>and</strong> specification <strong>of</strong> Coal;<br />

- Key parameters <strong>of</strong> the Long Term Coal Supply Contract;<br />

- Commercial track record <strong>of</strong> the Coal Supplier.<br />

Details <strong>of</strong> Coal <strong>and</strong> Ash H<strong>and</strong>ling Facilities as may be required at the Plant Site<br />

to meet or exceed the requirements <strong>of</strong> the Minimum Functional Specification.<br />

Electrical Interconnection<br />

Single line diagram up to the Interconnection Point showing all circuit breakers,<br />

isolators, Metering Point, current <strong>and</strong> potential trans<strong>for</strong>mers <strong>for</strong> metering <strong>and</strong><br />

protection, earthing switches, lightning arrestors, power trans<strong>for</strong>mers <strong>and</strong><br />

generators.<br />

The maximum make <strong>and</strong> break fault contributions to PPC’s Grid System from the<br />

Plant at 150 kV, including motor <strong>and</strong> generator contributions.<br />

Instrumentation <strong>and</strong> Control<br />

Instrumentation, control <strong>and</strong> protection systems including the relay protection<br />

scheme proposed by the Bidder <strong>for</strong> line, busbars, trans<strong>for</strong>mers, generators, etc.<br />

THE INSTITUTE FOR PUBLIC-PRIVATE PARTNERSHIPS 191