<strong>Development</strong> <strong>of</strong> <strong>Policy</strong>, <strong>Legal</strong>, & Institutional <strong>Framework</strong> <strong>for</strong> the PPP Program in Malawi<br />

Final Report<br />

- construction <strong>of</strong> the Special Facilities;<br />

- energising, synchronising, Uniting <strong>and</strong> testing the Plant;<br />

- implementing the Health <strong>and</strong> Safety Plan <strong>and</strong> Environmental Assessment<br />

<strong>and</strong> Management Plan<br />

<br />

<br />

<br />

<br />

<br />

<br />

Operation Phase obligations <strong>of</strong> the Seller, include:<br />

- operating <strong>and</strong> maintaining the Plant;<br />

- complying with Operating <strong>and</strong> Dispatch Procedures <strong>and</strong> Rules, <strong>and</strong><br />

Dispatch Instructions;<br />

Exclusive right <strong>of</strong> PPC (or its successor) as Buyer to purchase capacity <strong>and</strong><br />

electrical energy from the Plant throughout the Operating Phase.<br />

Liquidated damages <strong>for</strong>:<br />

- failure to achieve the Required Commercial Operation Date;<br />

- breach <strong>of</strong> per<strong>for</strong>mance warranties<br />

Payments to the Seller including:<br />

- Capacity payment;<br />

- Energy Payment<br />

- Start-Up Allowances.<br />

Obligation <strong>of</strong> the Seller to maintain specified insurances;<br />

Provision <strong>for</strong> early termination in specified circumstances with buy-out.<br />

INSTRUCTIONS TO BIDDERS<br />

Introduction<br />

Bidding Environment<br />

Generation to be provided by the Plant is a key component <strong>of</strong> PPC’s Long Term<br />

Generation Expansion Plan <strong>for</strong> the Java Grid <strong>and</strong> the failure to complete the Project by<br />

the Required Commercial Operation Date would result in the dispatch <strong>of</strong> higher cost<br />

generation.<br />

The bidding <strong>and</strong> award procedures <strong>and</strong> evaluation criteria have been structured to<br />

maximise the likelihood <strong>of</strong> achieving the Project milestone dates. Proposals that promise<br />

a smooth, swift <strong>and</strong> assured process <strong>for</strong> executing the Model PPA <strong>and</strong> achieving<br />

Financial Closure will be favoured.<br />