29.08.2014 Views

Development of Policy, Legal, and Insitutional Framework for - ppiaf

Development of Policy, Legal, and Insitutional Framework for - ppiaf

Development of Policy, Legal, and Insitutional Framework for - ppiaf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Development</strong> <strong>of</strong> <strong>Policy</strong>, <strong>Legal</strong>, & Institutional <strong>Framework</strong> <strong>for</strong> the PPP Program in Malawi<br />

Final Report<br />

including fire protection. Protection schemes may have interfacing with PPC’s<br />

equipment <strong>and</strong> these protective schemes are subject to concurrence <strong>of</strong> PPC.<br />

<br />

<br />

(vii)<br />

<br />

Communications systems <strong>and</strong> equipment <strong>for</strong>:<br />

- direct digital communications <strong>of</strong> dispatch instructions<br />

- voice communication with the Dispatch Centre<br />

- normal voice, email <strong>and</strong> facsimile communication<br />

- SCADA<br />

Metering devices <strong>and</strong> proposed location <strong>of</strong> Metering Equipment <strong>and</strong> Check<br />

Metering Equipment.<br />

General<br />

All other details necessary to enable PPC to ascertain if the proposed Plant will<br />

meet the Minimum Functional Specification.<br />

Target Availability<br />

The Seller will contract under the PPA to achieve availability levels with respect to the<br />

Net Dependable Capacity (taking into account planned maintenance outages, <strong>for</strong>ced<br />

outages <strong>and</strong> partial de-ratings) as follows:<br />

(i) Target Availability from Commercial Operation Date shall be at least 80%;<br />

(ii)<br />

Projected Availability <strong>for</strong> each Contract Year to be as nominated by the Bidder in<br />

its Proposal (referred Form D) <strong>and</strong> agreed between the Parties prior to the<br />

Execution Date;<br />

Organisation Plans<br />

The Bidder shall submit a detailed organisational chart, staffing plan <strong>and</strong> proposed<br />

quality assurance program in accordance with the requirements outlined in Form E.<br />

Insurance Plan<br />

The Bidder shall submit a detailed insurance plan <strong>for</strong> the Plant. The plan shall accord<br />

with the Model PPA <strong>and</strong> shall specify the type <strong>of</strong> insurances, the amount <strong>of</strong> cover.<br />

Domestic Participation<br />

Bidders shall provide in<strong>for</strong>mation on the proposed domestic participation in the Project,<br />

identifying the extent to which they plan to employ local contractors, suppliers <strong>and</strong><br />

labour in each <strong>of</strong> the Construction Phase <strong>and</strong> Operating Phase.<br />