Final Report<br />
assessed according to their technical compliance with the Model PPA <strong>and</strong> the Bidders’<br />
satisfactory responses to the RFP in<strong>for</strong>mation requirements. Among the issues to be<br />
satisfied are:<br />
(i) Plant Design Requirements (refer to Form D)<br />
<br />
<br />
<br />
<br />
<br />
<br />
The Technical Proposal shall include an outline design <strong>of</strong> the Plant<br />
con<strong>for</strong>ming to the Minimum Functional Specification.<br />
Plant shall be br<strong>and</strong> new<br />
The proposed steam turbine manufacturer shall have at least five years<br />
experience in the manufacture <strong>of</strong> steam turbines <strong>and</strong> equipment <strong>of</strong> similar<br />
rating <strong>and</strong> design to that proposed <strong>and</strong> such turbines <strong>and</strong> equipment shall<br />
have seen satisfactory service on other projects over a minimum period <strong>of</strong><br />
15000 hours.<br />
The proposed steam generator manufacturer shall have at least five years<br />
experience in the manufacture <strong>of</strong> steam generators <strong>and</strong> equipment <strong>of</strong><br />
similar rating <strong>and</strong> design to that proposed <strong>and</strong> such steam generators <strong>and</strong><br />
equipment shall have seen satisfactory service on other projects over a<br />
minimum period <strong>of</strong> 15000 hours.<br />
The proposed electric generators manufacturer shall have at least five years<br />
experience in the manufacture <strong>of</strong> electric generator <strong>and</strong> equipment <strong>of</strong><br />
similar rating <strong>and</strong> design to that proposed <strong>and</strong> such generator <strong>and</strong><br />
equipment shall have seen satisfactory service on other projects over a<br />
minimum period <strong>of</strong> 15000 hours.<br />
Expressions <strong>of</strong> Interest shall be included from the prospective plant<br />
suppliers confirming their commitment to supply the key items <strong>of</strong> plant<br />
including steam coal plant <strong>and</strong> coal h<strong>and</strong>ling system, steam generators,<br />
electrical generators, <strong>and</strong> steam turbines.<br />
(ii)<br />
Construction Phase Requirements<br />
<br />
<br />
<br />
<br />
A construction schedule in the required <strong>for</strong>mat shall be provided showing,<br />
amongst others, Required COD being achieved.<br />
The timetable given in the RFP <strong>and</strong> the scheduled operation dates in the<br />
PPA are accepted unconditionally.<br />
An undertaking is provided that construction impacts specified in the PPA<br />
are not exceeded;<br />
Proposed Construction Contractors shall have successfully completed<br />
Power Plant Project <strong>of</strong> at least 600 MW size<br />