<strong>Development</strong> <strong>of</strong> <strong>Policy</strong>, <strong>Legal</strong>, & Institutional <strong>Framework</strong> <strong>for</strong> the PPP Program in Malawi<br />

Final Report<br />

assessed according to their technical compliance with the Model PPA <strong>and</strong> the Bidders’<br />

satisfactory responses to the RFP in<strong>for</strong>mation requirements. Among the issues to be<br />

satisfied are:<br />

(i) Plant Design Requirements (refer to Form D)<br />

<br />

<br />

<br />

<br />

<br />

<br />

The Technical Proposal shall include an outline design <strong>of</strong> the Plant<br />

con<strong>for</strong>ming to the Minimum Functional Specification.<br />

Plant shall be br<strong>and</strong> new<br />

The proposed steam turbine manufacturer shall have at least five years<br />

experience in the manufacture <strong>of</strong> steam turbines <strong>and</strong> equipment <strong>of</strong> similar<br />

rating <strong>and</strong> design to that proposed <strong>and</strong> such turbines <strong>and</strong> equipment shall<br />

have seen satisfactory service on other projects over a minimum period <strong>of</strong><br />

15000 hours.<br />

The proposed steam generator manufacturer shall have at least five years<br />

experience in the manufacture <strong>of</strong> steam generators <strong>and</strong> equipment <strong>of</strong><br />

similar rating <strong>and</strong> design to that proposed <strong>and</strong> such steam generators <strong>and</strong><br />

equipment shall have seen satisfactory service on other projects over a<br />

minimum period <strong>of</strong> 15000 hours.<br />

The proposed electric generators manufacturer shall have at least five years<br />

experience in the manufacture <strong>of</strong> electric generator <strong>and</strong> equipment <strong>of</strong><br />

similar rating <strong>and</strong> design to that proposed <strong>and</strong> such generator <strong>and</strong><br />

equipment shall have seen satisfactory service on other projects over a<br />

minimum period <strong>of</strong> 15000 hours.<br />

Expressions <strong>of</strong> Interest shall be included from the prospective plant<br />

suppliers confirming their commitment to supply the key items <strong>of</strong> plant<br />

including steam coal plant <strong>and</strong> coal h<strong>and</strong>ling system, steam generators,<br />

electrical generators, <strong>and</strong> steam turbines.<br />

(ii)<br />

Construction Phase Requirements<br />

<br />

<br />

<br />

<br />

A construction schedule in the required <strong>for</strong>mat shall be provided showing,<br />

amongst others, Required COD being achieved.<br />

The timetable given in the RFP <strong>and</strong> the scheduled operation dates in the<br />

PPA are accepted unconditionally.<br />

An undertaking is provided that construction impacts specified in the PPA<br />

are not exceeded;<br />

Proposed Construction Contractors shall have successfully completed<br />

Power Plant Project <strong>of</strong> at least 600 MW size<br />