Development of Policy, Legal, and Insitutional Framework for - ppiaf
Development of Policy, Legal, and Insitutional Framework for - ppiaf
Development of Policy, Legal, and Insitutional Framework for - ppiaf
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Development</strong> <strong>of</strong> <strong>Policy</strong>, <strong>Legal</strong>, & Institutional <strong>Framework</strong> <strong>for</strong> the PPP Program in Malawi<br />
Final Report<br />
Electricity Payments <strong>and</strong> Supporting Cost Data<br />
The Forms submitted by Bidders in compliance with the requirements <strong>for</strong> the Price<br />
Proposal shall provide the required base rates <strong>for</strong> calculating the Capacity Charge <strong>and</strong><br />
Energy Charge components in their relevant currencies.<br />
Bidders may be required to justify their calculations <strong>of</strong> electricity prices <strong>and</strong> provide<br />
supporting documentation <strong>and</strong> cost data, as requested. Such in<strong>for</strong>mation provided by<br />
the Bidder will be treated as confidential.<br />
The contracted Capacity Charge, Energy Charge <strong>and</strong> other scheduled electricity<br />
payments shall be paid in accordance with the terms <strong>and</strong> conditions <strong>of</strong> the PPA. All<br />
payments <strong>for</strong> the purchase <strong>of</strong> capacity <strong>and</strong> energy from the Plant will be calculated in<br />
Indonesian Kwacha <strong>and</strong> will be paid in Kwacha. Conversion <strong>of</strong> Kwacha to US$ or other<br />
currencies <strong>for</strong> the payment <strong>of</strong> costs <strong>and</strong> dividends outside Malawi shall be the sole<br />
responsibility <strong>of</strong> the Seller.<br />
Deviations from the Model PPA<br />
Should the Bidder wish to propose non-material deviations from the Model PPA, they<br />
shall be entered into the Form provided as Form H. The determination <strong>of</strong> whether a<br />
change proposed by a Bidder is material or non-material shall always be at the<br />
discretion <strong>of</strong> PPC’s Tender Committee. Any changes other than to correct numerical<br />
errors, to incorporate specific in<strong>for</strong>mation about the bid or change wordings to clarify<br />
sentences in the PPA shall be deemed to be a material change. Each proposed deviation<br />
shall be described <strong>and</strong> explained. The Bidder shall also specify in “mark-up” <strong>for</strong>m the<br />
precise wording <strong>of</strong> the amendment it proposes to the relevant Project Document<br />
provision.<br />
The Bidder shall confirm in its Proposal its acceptance <strong>of</strong>, <strong>and</strong> willingness to execute, the<br />
Model PPA without amendment save only the amendments made through the issue <strong>of</strong><br />
Addenda prior to Bid Closing <strong>and</strong> the non-material deviations noted in Form H.<br />
Proposal Letters <strong>and</strong> Forms<br />
Introductory Notes<br />
The Proposal to be prepared by the Bidder shall include the documents <strong>and</strong> Forms<br />
specified in the RFP. The Bidder’s attention is drawn to the Instructions to Bidders, <strong>and</strong><br />
in particular to the requirement that the Bidder shall complete the Forms <strong>and</strong> respond to<br />
the questions in the specified <strong>for</strong>mat <strong>and</strong> in compliance with the RFP.<br />
Where the Bidder is a consortium with two or more members, each being a properly<br />
constituted company, corporation, firm, joint venture or other entity, each member shall,<br />
where relevant <strong>and</strong> applicable, separately complete the Forms <strong>and</strong> otherwise responds<br />
THE INSTITUTE FOR PUBLIC-PRIVATE PARTNERSHIPS 196