<strong>Development</strong> <strong>of</strong> <strong>Policy</strong>, <strong>Legal</strong>, & Institutional <strong>Framework</strong> <strong>for</strong> the PPP Program in Malawi<br />

Final Report<br />

The results above indicate that Option 5 is significantly more attractive than the other options.<br />

A detailed discussion <strong>of</strong> Option 5 is presented later in this section. In reading these options<br />

analysis results, one should keep in mind that a PPP Act might be needed as a mechanism <strong>for</strong><br />

showing the populace that Government is serious about PPP. Such an Act might not be<br />

necessary <strong>for</strong> technical reasons relating to the legal framework, e.g. to fill gaps in the existing<br />

framework or to enable activities not yet clearly authorized, but might be necessary as a<br />

mechanism <strong>for</strong> giving weight to the PPP <strong>Policy</strong> initiative. This issue will be explored further<br />

when we provide a detailed analysis <strong>of</strong> the three top ranked options, later in this section.<br />

Do Not Enact a New PPP Act (5 Options)<br />

Option 1 1 1 2 2 2 3 3 3 4 4 4 5 5 5<br />

Factor Score Weight Rank Score Weight Rank Score Weight Rank Score Weight Rank Score Weight Rank<br />

1 8 7 56 8 7 56 3 7 21 5 7 35 5 7 35<br />

2 3 6 18 6 6 36 8 6 48 8 6 48 6 6 36<br />

3 6 5 30 6 5 30 7 5 35 2 5 10 2 5 10<br />

4 7 4 28 6 4 24 1 4 4 8 4 32 5 4 20<br />

5 3 3 9 1 3 3 3 3 9 7 3 21 6 3 18<br />

6 7 2 14 1 2 2 7 2 14 8 2 16 6 2 12<br />

7 5 1 5 1 1 1 6 1 6 7 1 7 5 1 5<br />

Total 160 152 137 169 136<br />

The results above indicate that Option 4 is the preferred option. There is some concern that the<br />

score <strong>for</strong> Options 1 <strong>and</strong> 4 are relatively close, <strong>and</strong> that means the reader should carefully<br />

examine the individual components <strong>of</strong> those scores to ensure that there has not been any<br />

distortion in the analysis. In considering this matter, we applied a subjective analysis that<br />

supported the technical options analysis result, as follows: there has been a continuing theme on<br />

the part <strong>of</strong> donor <strong>and</strong> Government that some kind <strong>of</strong> a clear signal needs to be sent that PPP is<br />

an important policy objective. In addition, the economy <strong>of</strong> Malawi has a long history <strong>of</strong><br />

government control, <strong>and</strong> that makes it more difficult <strong>for</strong> a new PPP orientation to take hold<br />

unless there is a clear policy <strong>and</strong> legal “push” <strong>for</strong> the new PPP program. Without at least<br />

pushing <strong>for</strong>ward the new PPP <strong>Policy</strong> by enacting new PPP regulations (the scenario under<br />

Option 4) <strong>and</strong> just leaving the market to pursue PPP by simply removing present impediments<br />

to it in the legal framework (the scenario under Option 1), we believe the PPP program would<br />

stall. On this basis, our subjective evaluation supported the selection <strong>of</strong> Option 4 per the<br />

options analysis results above.<br />

Detailed Analysis <strong>of</strong> Best Three Options<br />