<strong>Development</strong> <strong>of</strong> <strong>Policy</strong>, <strong>Legal</strong>, & Institutional <strong>Framework</strong> <strong>for</strong> the PPP Program in Malawi<br />

Final Report<br />

Services <strong>and</strong> Utilities<br />

The Seller will be required to arrange or provide all services <strong>and</strong> utilities <strong>for</strong> the Project<br />

unless otherwise expressly stated.<br />

The Seller may apply to PPC during the Construction Phase <strong>for</strong> an 20 kV connection (if<br />

available), which will be provided on the same terms <strong>and</strong> prices as apply at the time <strong>for</strong><br />

applicable PPC’s consumers Tariff, in the case such supply from PPC is not available,<br />

Seller should provide by its own construction power.<br />

Environmental Obligations<br />

The Seller will be required to prepare an Environmental Assessment <strong>and</strong> Management<br />

Plan that complies with relevant <strong>Legal</strong> requirements <strong>and</strong> Environmental Requirements.<br />

The Seller shall apply <strong>for</strong>, <strong>and</strong> obtain, an appropriate licence from responsible<br />

organisation <strong>and</strong> shall meet the conditions <strong>of</strong> that license at all times during the<br />

Construction Phase <strong>and</strong> Operating Phase.<br />

The Bidder shall describe qualitatively <strong>and</strong> quantitatively the potential environmental<br />

impacts <strong>of</strong> the Plant it proposes <strong>and</strong> shall support its submission with details including,<br />

among other things:<br />

<br />

<br />

<br />

<br />

<br />

A description <strong>of</strong> environmental mitigation <strong>and</strong> protection measures to be<br />

implemented.<br />

The quantities <strong>and</strong> types <strong>of</strong> all liquid <strong>and</strong> solid effluents, including sewage<br />

system, that will be produced at the Plant Site, <strong>and</strong> the methods to be employed<br />

<strong>for</strong> neutralising these effluents. The proposed methods <strong>for</strong> disposal <strong>of</strong> all liquid<br />

<strong>and</strong> solid wastes from the power station including any Coal <strong>and</strong> Ash / Wastes<br />

H<strong>and</strong>ling should be clearly outlined in the Proposal.<br />

The quantities <strong>and</strong> rates <strong>of</strong> emissions <strong>of</strong> pollutants, including the types <strong>of</strong><br />

pollutants, <strong>and</strong> details <strong>of</strong> the proposed methods <strong>of</strong> pollution control <strong>and</strong> types <strong>of</strong><br />

pollution control equipment (e.g. dust control, electric precipitator <strong>and</strong> if<br />

necessary desulphurization device), <strong>and</strong> other mitigation measures. Guaranteed<br />

emission rates should also be provided.<br />

The effects on marine, estuarine or riverine environments, as appropriate,<br />

including water temperature, morphology <strong>and</strong> aquatic biodiversity. The location<br />

<strong>of</strong> abstraction <strong>and</strong> discharge points <strong>and</strong> other such details shall be provided.<br />

Construction effects (e.g. impacts associated with to transportation <strong>of</strong> plant to the<br />

Plant Site, construction within the Plant Site Services Corridors, etc.).<br />

THE INSTITUTE FOR PUBLIC-PRIVATE PARTNERSHIPS 193