(MERAF) for the Base Metals Smelting Sector - CCME
(MERAF) for the Base Metals Smelting Sector - CCME
(MERAF) for the Base Metals Smelting Sector - CCME
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 13: Releases of Dioxins and Furans. The sources of in<strong>for</strong>mation <strong>for</strong> this table are noted below.<br />
Province Facility Emission<br />
Concentratio<br />
n (pg<br />
ITEQ/m 3 )<br />
British-<br />
Columbia<br />
Teck<br />
Cominco Trail<br />
No test data<br />
available.<br />
Test Date<br />
Estimated Annual Release<br />
(grams ITEQ)<br />
1999 2000 2001<br />
April 2002 (1) 0.0004 0.0153<br />
(2) (3)<br />
Comments<br />
2000 annual release based on dust analysis,<br />
not emissions testing. Emission testing of 4<br />
different sources conducted in April 2002. (1)<br />
Manitoba Hudson Bay No test data<br />
available.<br />
June 2002 (4) Emission testing of main stack summer 2002.<br />
(1)<br />
Inco<br />
34 (5) August 2001 0.34 Emission testing of main stack.<br />
(Thompson)<br />
(6)<br />
Ontario Falconbridge,<br />
Kidd<br />
2.3 (7) June 2001 0.002<br />
(7)<br />
Emission testing of copper smelter acid plant<br />
tail gas.<br />
Falconbridge,<br />
Sudbury<br />
559 (8)<br />
459 (9)<br />
May 1999<br />
April 2000<br />
2.9 (8) 2.38 (11) 1.13<br />
(6)<br />
Emission testing of main stack.<br />
Québec<br />
New<br />
Brunswick<br />
Inco, Copper<br />
Cliff<br />
Noranda,<br />
Horne<br />
Noranda,<br />
CEZ<br />
Noranda,<br />
CCR<br />
Noranda,<br />
Gaspé<br />
Noranda,<br />
Brunswick<br />
286 (10) June 2001<br />
No test data November<br />
0.66<br />
available. 2001<br />
(6)<br />
3.2 (12) June 2000 0.01 (12) 0.09<br />
(6)<br />
1.1 (13) October 2001 0.003<br />
(13)<br />
No test data Planned <strong>for</strong><br />
available. 2002. (4)<br />
82 (14) August 2001 0.19 (11) 0.10<br />
(6)<br />
No test data Planned <strong>for</strong><br />
0.00477 0.10<br />
available. 2002. (4)<br />
(2) (6)<br />
Emission test report not available.<br />
Emission testing of acid plant tail gas (treats<br />
Noranda Reactor off-gas).<br />
Emission testing of acid plant tail gas (treats<br />
zinc roaster off-gas).<br />
Emissions testing planned <strong>for</strong> summer 2002.<br />
Emission testing of main stack (acid plant tail<br />
gas and smelter off-gas).<br />
2000 annual release based on dust analysis,<br />
not emissions testing. Emissions testing<br />
planned <strong>for</strong> summer 2002.<br />
TOTAL 2.9 2.6 2.4 Total based on available in<strong>for</strong>mation only.<br />
Notes: Sherritt and Inco Port Colborne are not included in this table, as both facilities use hydrometallurgical processes and <strong>the</strong>re<strong>for</strong>e are not<br />
considered to release significant quantities of dioxins and furans.<br />
109