02.09.2014 Views

(MERAF) for the Base Metals Smelting Sector - CCME

(MERAF) for the Base Metals Smelting Sector - CCME

(MERAF) for the Base Metals Smelting Sector - CCME

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 13: Releases of Dioxins and Furans. The sources of in<strong>for</strong>mation <strong>for</strong> this table are noted below.<br />

Province Facility Emission<br />

Concentratio<br />

n (pg<br />

ITEQ/m 3 )<br />

British-<br />

Columbia<br />

Teck<br />

Cominco Trail<br />

No test data<br />

available.<br />

Test Date<br />

Estimated Annual Release<br />

(grams ITEQ)<br />

1999 2000 2001<br />

April 2002 (1) 0.0004 0.0153<br />

(2) (3)<br />

Comments<br />

2000 annual release based on dust analysis,<br />

not emissions testing. Emission testing of 4<br />

different sources conducted in April 2002. (1)<br />

Manitoba Hudson Bay No test data<br />

available.<br />

June 2002 (4) Emission testing of main stack summer 2002.<br />

(1)<br />

Inco<br />

34 (5) August 2001 0.34 Emission testing of main stack.<br />

(Thompson)<br />

(6)<br />

Ontario Falconbridge,<br />

Kidd<br />

2.3 (7) June 2001 0.002<br />

(7)<br />

Emission testing of copper smelter acid plant<br />

tail gas.<br />

Falconbridge,<br />

Sudbury<br />

559 (8)<br />

459 (9)<br />

May 1999<br />

April 2000<br />

2.9 (8) 2.38 (11) 1.13<br />

(6)<br />

Emission testing of main stack.<br />

Québec<br />

New<br />

Brunswick<br />

Inco, Copper<br />

Cliff<br />

Noranda,<br />

Horne<br />

Noranda,<br />

CEZ<br />

Noranda,<br />

CCR<br />

Noranda,<br />

Gaspé<br />

Noranda,<br />

Brunswick<br />

286 (10) June 2001<br />

No test data November<br />

0.66<br />

available. 2001<br />

(6)<br />

3.2 (12) June 2000 0.01 (12) 0.09<br />

(6)<br />

1.1 (13) October 2001 0.003<br />

(13)<br />

No test data Planned <strong>for</strong><br />

available. 2002. (4)<br />

82 (14) August 2001 0.19 (11) 0.10<br />

(6)<br />

No test data Planned <strong>for</strong><br />

0.00477 0.10<br />

available. 2002. (4)<br />

(2) (6)<br />

Emission test report not available.<br />

Emission testing of acid plant tail gas (treats<br />

Noranda Reactor off-gas).<br />

Emission testing of acid plant tail gas (treats<br />

zinc roaster off-gas).<br />

Emissions testing planned <strong>for</strong> summer 2002.<br />

Emission testing of main stack (acid plant tail<br />

gas and smelter off-gas).<br />

2000 annual release based on dust analysis,<br />

not emissions testing. Emissions testing<br />

planned <strong>for</strong> summer 2002.<br />

TOTAL 2.9 2.6 2.4 Total based on available in<strong>for</strong>mation only.<br />

Notes: Sherritt and Inco Port Colborne are not included in this table, as both facilities use hydrometallurgical processes and <strong>the</strong>re<strong>for</strong>e are not<br />

considered to release significant quantities of dioxins and furans.<br />

109

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!