07.11.2014 Views

2010 MEDIA GUIDE - Seahawks Online Media Packet

2010 MEDIA GUIDE - Seahawks Online Media Packet

2010 MEDIA GUIDE - Seahawks Online Media Packet

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

VIRGINIA MASON<br />

ATHLETIC CENTER<br />

Official Name<br />

Virginia Mason Athletic Center<br />

The facility name is part of a broad Seattle <strong>Seahawks</strong> and Virginia Mason<br />

partnership to support the health and well-being of our com. munity<br />

Location<br />

The site is bounded by Interstate 405 to the east, Lake Washington to the west,<br />

residential properties to the north and open land area to the south. Its southern<br />

boundary is located approximately 1/4 of mile north of 44th Street.<br />

Site Size<br />

Approximately 19.0 acres of buildable land area.<br />

Project Size<br />

Approximately 200,000 gross square feet of enclosed space including the indoor<br />

practice field.<br />

Building Size<br />

Approximately 124,000 gross square feet of administration and training facilities.<br />

Outdoor Fields Area Three regulation size grass fields<br />

Indoor Practice Area One regulation size artificial field with clear height of 95’ allowing for kicking and<br />

punting.<br />

First Floor<br />

Team area and auditorium, including locker room, lounge, training room, weight<br />

room, team meeting rooms and media production studios.<br />

Second Floor<br />

<strong>Seahawks</strong> football administration. Approximately 48,000 gross square feet of<br />

coaching and football personnel offices, draft room, cafeteria and weight room<br />

mezzanine.<br />

Third Floor<br />

<strong>Seahawks</strong> administrative offices.<br />

Training Camp<br />

The new facility will host <strong>Seahawks</strong> training camp.<br />

VMAC Programming The VMAC will serve as a location for health and community programming.<br />

On Site Parking Approximately 275 cars<br />

Construction Schedule 18 months<br />

Ground Breaking January 2007<br />

Completion Date Summer 2008<br />

Architects<br />

Crawford Architects<br />

Funding<br />

Private<br />

FAN INFORMATION 395

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!