CRPF Campus, Kaderpur<br />
Approved Cost: Rs. 28.50 crore<br />
Seating Capacity: 324<br />
The CRPF campus was constructed in 16 months as the<br />
competition venue for Big-Bore Shooting. It is the first full<br />
bore shooting range in India spanning 1,000 yards. Designed<br />
for shooting at 300 yards, 300 m, 500 yards, 600 yards, 900<br />
yards and 1000 yards, 20 shooters can shoot here at a time.<br />
There is a 5 m metalled road on one side and a 2.5 m paved<br />
foot path on other and both sides are fenced with a 2 m high<br />
chain link fencing.<br />
Some safety measures incorporated into the venue include:<br />
• 13 m high end butt wall across full width with 25 m wing<br />
wall on both sides<br />
• RCC safety baffles of varying heights and widths designed<br />
for deflection of 110 at each firing point<br />
• 500 mm high RCC cross walls at 300 yards, 500 yards,<br />
600 yards, 700 yards, 750 yards, 800 yards, 850 yards, 900<br />
yards, 945 yards and 975 yards to check ricochet<br />
<strong>POST</strong> <strong>GAMES</strong> <strong>REPORT</strong> DELHI 2010 139