POST GAMES REPORT - Commonwealth Games Federation
POST GAMES REPORT - Commonwealth Games Federation
POST GAMES REPORT - Commonwealth Games Federation
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
The Operational Zone housed service areas such<br />
as the village operations centre, security command centre,<br />
logistics and technology centre, athlete transport mall and<br />
external parking, etc.<br />
• The entire complex is designed to make it usable at the<br />
end of the <strong>Games</strong> for residential purposes.<br />
• The sense of being part of a cohesive integrated community<br />
for the duration of the <strong>Games</strong>, the ease and efficiency<br />
of circulation, as well as the quality of accommodation,<br />
recreation, dining and support services to make the stay<br />
of visitors a cherished experience.<br />
Details<br />
Entrance<br />
Lifts<br />
Ramps<br />
Guide Tiles<br />
Toilets<br />
Emergency exits<br />
Training Areas<br />
Salient Features<br />
Ramps with handrails provided at all entry exit points<br />
Two lifts with wheel chair access (13 passenger<br />
capacity) in the central block with access to the<br />
pavilion building<br />
Ramps with appropriate slope and grab bars provided<br />
wherever there is level difference<br />
Texture difference on floor wherever there is a level<br />
difference<br />
Toilets for physically challenged along with all the<br />
change rooms<br />
All emergency exits with ramps and grab rails at the<br />
ground floor<br />
Room Analysis:<br />
UNIT TYPE OF NO. OF UNITS NO. OF ROOMS<br />
2 Bedrooms 31 62<br />
3 Bedrooms 765 2295<br />
4 Bedrooms 209 836<br />
5 Bedrooms 163 815<br />
Unit Total 1168 4008<br />
Area : 11.00 hectare<br />
No. of Flats : 1,168<br />
No. of Rooms : 4,008<br />
No. of Towers : 34 towers varying from six to nine storeys<br />
• Athletics Stadium with flood lights (400 m eight lane<br />
synthetic track, covered pavilion and separate area for<br />
Throw events)<br />
• Fitness centre and gymnastics and sauna facilities<br />
• Indoor hall (Weightlifting and Wrestling)<br />
• All season Aquatics facilities (50 x25 m, kids and leisure<br />
pool)<br />
Temporary Structures<br />
Structures<br />
• Operation Zone 1<br />
• Operational Zone 2<br />
• Transport mall<br />
152<br />
<strong>POST</strong> <strong>GAMES</strong> <strong>REPORT</strong> DELHI 2010