<strong>Renewable</strong> <strong>Energy</strong> <strong>Resources</strong> in <strong>Oman</strong><br />

Project B: 20 kW Grid C<strong>on</strong>nected Solar PV<br />

Purposes:<br />

To dem<strong>on</strong>strate the technology and obtain experiences with<br />

the operati<strong>on</strong> under <strong>Oman</strong>i c<strong>on</strong>diti<strong>on</strong>s. The results of this<br />

project could be used as a basis <strong>for</strong> the design of larger PV<br />

projects. We recommend undertaking a number of small scale<br />

projects <strong>for</strong> different types of applicati<strong>on</strong>s: <strong>on</strong> buildings, parking<br />

areas etc.<br />

Technology: 20 kW system c<strong>on</strong>sisting of 20 kWp solar PV panels (app. 200<br />

m 2 ) and a 20 kW power c<strong>on</strong>verter.<br />

Locati<strong>on</strong>:<br />

Annual energy output :<br />

Budget:<br />

<strong>Energy</strong> producti<strong>on</strong> cost:<br />

Rural area, c<strong>on</strong>nected to local grid/power system.<br />

34 MWh/year<br />

USD 150,000 (tentative)<br />

425 USD/MWh<br />

Be<strong>for</strong>e implementing these types of projects, we recommend further detailed<br />

technical and ec<strong>on</strong>omic analysis is undertaken to verify assumpti<strong>on</strong>s in this report<br />

and c<strong>on</strong>firm the suitability of individual project locati<strong>on</strong>s.<br />

We also recommend the implementati<strong>on</strong> of a wind m<strong>on</strong>itoring programme in<br />

south <strong>Oman</strong> al<strong>on</strong>g the coast and in the mountains north of Salalah to verify and<br />

map wind energy resources. This programme should also include detailed grid<br />

analysis to determine the amount of wind turbine capacity that could be c<strong>on</strong>nected<br />

to the Salalah Power System (noting that <strong>for</strong> technical reas<strong>on</strong>s wind turbine<br />

capacity should normally not exceed 15% to 20% of total system capacity).<br />

We expect the wind m<strong>on</strong>itoring programme to support the early implementati<strong>on</strong><br />

of a wind turbine project such as Project C.<br />

Project C: 10 MW Grid C<strong>on</strong>nected Wind Farm<br />

Purposes:<br />

Technology:<br />

Locati<strong>on</strong>:<br />

Annual energy output:<br />

Budget:<br />

<strong>Energy</strong> producti<strong>on</strong> cost:<br />

Dem<strong>on</strong>strate the technology and obtain experience of operating<br />

the technology under <strong>Oman</strong>i c<strong>on</strong>diti<strong>on</strong>s.<br />

10 MW Wind farm c<strong>on</strong>sisting of 5 x 2 MW wind turbines.<br />

Dhofar, Thumrait/Quiro<strong>on</strong> Hariti area.<br />

25-30 GWh/year.<br />

USD 20 - 22 mill. (tentative)<br />

65 USD/MWh.<br />

Page 25 of 134<br />

.