Chapter 5 PLANT MANAGEMENT AND CONTROL<br />

(ii)<br />

Hoisting System<br />

The gear drive units shall be checked daily for oil leaks. When operating, check for unusual noise.<br />

Run at least 10 minutes each week while it is idle. Check the oil level before starting.<br />

No. Item Things to look for<br />

(a) <strong>Electrical</strong> connections Monthly check on loose connection<br />

(b) Gearbox <strong>and</strong> actuator Monthly inspection on oil leaks.<br />

(Note: replace oil every two years for SAE 90 EP)<br />

(c) Operator’s control Monthly check for proper operation<br />

(d) Wire rope Monthly inspection on broken str<strong>and</strong>s <strong>and</strong> wear.<br />

(e) Shaft <strong>and</strong> coupling Monthly check on loose bolts <strong>and</strong> broken parts<br />

(f) Drum <strong>and</strong> sheaves Monthly check on groove wears. Lubricate if necessary<br />

(g) Actuator battery Monthly check on the battery level status (icon<br />

display). Replace battery every 5 years<br />

Note: Detailed information on battery replacement <strong>and</strong> torque/position monitoring is contained in<br />

Chapter 10 of Rotork IQ Range Installation <strong>and</strong> Maintenance Instructions.<br />

2 YEARLY OPERATION CHECK<br />

Proper schedule of testing is necessary to ensure the whole gate system continues to function well.<br />

2.1 Gate<br />

Operate the gate through a complete cycle from fully closed to fully open then to fully closed,<br />

checking that the gate moves freely <strong>and</strong> smoothly.<br />

Tell-tale sign associated with the potential operating problems with the gates:<br />

• Jerking or rough operation<br />

• Leakage through sealing area<br />

• Vibration of the gate<br />

• Abnormal noise<br />

• Binding<br />

2.2 <strong>Electrical</strong> System<br />

All electrical connections <strong>and</strong> electrical cables shall be visually inspected for external deformed,<br />

damage, <strong>and</strong> for indication of possible damages. Equipment found to be deformed or damaged shall<br />

be removed <strong>and</strong> investigation shall be carried out before being replaced. Check all equipment<br />

grounding conductors for proper connections.<br />

2.3 Hoisting System (Actuator, Gearbox, Transmission Shaft, Rope-drum)<br />

Operate the gate from full open to close <strong>and</strong> vice versa, check that all parts function properly <strong>and</strong><br />

operate smoothly, <strong>and</strong> that the control of all load during lowering is accurate <strong>and</strong> not jerky.<br />