31.12.2014 Views

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 2 GATE DESIGN<br />

Table of Contents<br />

Table of Contents .................................................................................................................... 2-i<br />

List of Tables ................................................................................................................... 2-iii<br />

List of Figures ................................................................................................................... 2-iii<br />

2.1 INTRODUCTION .......................................................................................................... 2-1<br />

2.2 TYPES OF GATES ......................................................................................................... 2-6<br />

2.2.1 Roller Type ................................................................................................... 2-6<br />

2.2.2 Hinged Type ................................................................................................. 2-9<br />

2.2.3 Slide Type .................................................................................................. 2-13<br />

2.2.4 Flap Gate ................................................................................................... 2-15<br />

2.2.5 Stop logs <strong>and</strong> Bulkhead Gates ...................................................................... 2-17<br />

2.3 GATE DESIGN ........................................................................................................... 2-18<br />

2.3.1 General ...................................................................................................... 2-18<br />

2.3.2 Loads to be Considered ............................................................................... 2-19<br />

2.3.3 Shape of Gate Leaf, Gate Guide <strong>and</strong> Anchorage ............................................. 2-19<br />

2.3.4 Seal Part .................................................................................................... 2-19<br />

2.3.5 Corrosion Allowance .................................................................................... 2-19<br />

2.3.6 Deflection of Gate Leaf ................................................................................ 2-20<br />

2.3.7 Operating Speed ......................................................................................... 2-20<br />

2.3.8 Lifting Height .............................................................................................. 2-20<br />

2.3.9 Leakages .................................................................................................... 2-20<br />

2.3.10 Hoist System .............................................................................................. 2-21<br />

2.4 MATERIAL SELECTION ............................................................................................... 2-21<br />

2.4.1 Materials for Hydraulic Gates ........................................................................ 2-22<br />

2.4.2 Penstock Materials ...................................................................................... 2-22<br />

2.4.3 Corrosion Protection .................................................................................... 2-23<br />

2.5 GATE INSTALLATION ................................................................................................. 2-24<br />

2.5.1 H<strong>and</strong>ling During Transportation .................................................................... 2-25<br />

2.5.2 General Installation ..................................................................................... 2-25<br />

2.5.3 Installation of Gate Guide <strong>and</strong> Anchorage ..................................................... 2-25<br />

2.5.4 Installation of Seal Part ............................................................................... 2-25<br />

2.6 GATE TESTING AND COMMISSIONING ........................................................................ 2-26<br />

2.6.1 Penstock inspection <strong>and</strong> testing .................................................................... 2-26<br />

2.7 GATE OPERATION & MAINTENANCE MANUAL .............................................................. 2-27<br />

APPENDIX 2A SAMPLE METHOD STATEMENT FOR TILTING GATE AND HYDRAULIC CYLINDER<br />

INSTALLATION ........................................................................................... 2A-1<br />

March 2009 2-i

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!