31.12.2014 Views

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Device in the Solar Panel<br />

Chapter 6 ENERGY EFFICIENCY IN MANAGEMENT OF M&E INSTALLATION<br />

a) Solar Charge Regulator: To control the solar system , battery charging <strong>and</strong> alarm system<br />

b) Temp Probe: This is control the panel temp. This is also to on the FAN in the panel.<br />

c) Lightning Arrestor : To protect the Lightning surge to the system<br />

d) PV Fuse link: This to protect the solar part.<br />

e) AC Output to Load Connector AC Distribution from Inverter for output usage:<br />

f) Solar input Connector: From Solar input voltage to connect to Solar Charge Regulator.<br />

g) 48Vdc Isolator to inverter: To isolate the battery 48Vdc to connect to Inverter.<br />

h) AC Inv Input Connector: AC Output from INVERTER connector.<br />

i) 48 Vdc Fuse: This is to protect the battery due to high current.<br />

6-10 March 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!