Chapter 10 SCADA AND AUTOMATION SYSTEM<br />

f) shall ensure all electrical installation are relevant <strong>and</strong> comply with international st<strong>and</strong>ard.<br />

g) shall be at site during pre-test <strong>and</strong> Testing <strong>and</strong> Commissioning <strong>and</strong> submit test report.<br />

h) review <strong>and</strong> propose appropriate test <strong>and</strong> checklist for pre-test <strong>and</strong> Testing <strong>and</strong><br />

commissioning.<br />

i) shall review all manuals (which include operation & maintenance manuals) <strong>and</strong> training<br />

documents.<br />

10.12 MAINTENANCE OF SCADA SYSTEM<br />

Maintenance needs to be carried out to make sure the system always in tip-top condition. Contractor<br />

should carry out schedule of maintenance during warranty period for three (3) years (Once every 3<br />

months) after successful commissioning of the system. The contractor shall prepare `Schedule<br />

Maintenance Plan’ every quarterly during the warranty period <strong>and</strong> the cost shall be included in the<br />

tender. A maintenance report specifically on every site should be prepared after every maintenance<br />

services. Maintenance carried out should at least cover items as below:<br />

a) Main Power Supply<br />

b) Secondary Power Back up<br />

c) Gate Operation (Manual, Auto, Remote, Local <strong>and</strong> Emergency Stop)<br />

d) Water Level <strong>and</strong> Level Sensor<br />

e) Touch Screen Function<br />

f) Emergency Alert<br />

g) Actuator Functioning <strong>and</strong> setting<br />

h) Info Request/Communication Testing<br />

i) SCADA server maintenance<br />

j) SCADA workstation maintenance<br />

k) Remote Dial in Monitoring <strong>and</strong> Control<br />

l) Control Panel Cleaning <strong>and</strong> Maintenance<br />

10-22 March 2009