Chapter 8 DREDGER<br />

3.2 Speed Boat - Rental & Operation<br />

Rental <strong>and</strong> Operational Rate Per Month @ Rate Rate x 26 day/mth RM<br />

____ (RM/day)<br />

c. Speed Boat Cost / m 3 RM<br />

3.3 Floating Pipe - Wear & Tear<br />

Total length of pipe req. - 1 ,300m<br />

Total cost of pipe @ Rate____(RM/meter length)<br />

Life span of pipe - 1 million cu.m<br />

Rate x 1300 m<br />

d Floating Pipe Cost / m 3 RM<br />

3.4 Floater For Floating Pipe - Wear & Tear<br />

Total no. of floater req. @ 1,300m/12 =100 Nos<br />

Total cost of floater - Rate____(RM/unit)<br />

Rate x 100nos<br />

RM<br />

Life span of floater - 10 million cu.m<br />

e Floater Cost / m 3 RM<br />

3.5 Rubber Hose (Jointing Floating Pipe) - Wear &<br />

Tear<br />

Total no. of rubber hose req. @ 1,300/12 =100<br />

Nos<br />

Total cost of rubber hose - Rate____(RM/unit)<br />

Life span of rubber horse - 2.0 million cu.m<br />

Rate x 100 nos *<br />

f Rubber Hose Cost / m 3 RM<br />

3.6 Other Facilities - Rental & Operation<br />

Welding Set - 2 Nos @ Rate____(RM/mth)<br />

Generator Set - 2 No= @ Rate____(RM/mth)<br />

Workshop Cabin & Store @ Rate____(RM/mth)<br />

Welder - 2 Person @ Rate____(RM/mth)<br />

2Nos x monthly rate<br />

2 Nos X monthly rate<br />

monthly rate<br />

2 x rate X 1.4 x 100%<br />

RM<br />

RM<br />

RM<br />

RM<br />

Sub -total<br />

RM<br />

g Other Facilities Cost/m 3 RM<br />

4.0 Supervision Cost For Dredging Works<br />

Project Manager- 1 Person @ Rate____(RM/mth)<br />

Site Engineer - 1 Person @ Rate____(RM/mth)<br />

Site Supervisor - 4 Person@ Rate____(RM/mth)<br />

1 x rate. x 1.7 x 70%<br />

1 x rate.x1.7<br />

4 x rate x 1.4x100%<br />

RM<br />

RM<br />

RM<br />

Lab. Assistant - 1 Person @ Rate____(RM/mth) 1x rate x 1.4 x 100% RM<br />

Accomodation - 2 Nos x monthly rate<br />

Transportation - 2 Nos x monthly rate<br />

Others Miscellaneous @ Rate____(RM/mth)<br />

Rate<br />

rate<br />

rate<br />

RM<br />

RM<br />

RM<br />

Sum<br />

Sub -total<br />

RM<br />

Supervision Cost / m 3<br />

RM<br />

Rate of Dredging Cost / Cu.M - ( sum a - g & 4.0<br />

)<br />

Allow during 1 month of idling time due weather<br />

conditions - Add 4%<br />

Allow for 15% Profit<br />

Rate For Dredging Works Per Cu.M<br />

RM<br />

RM<br />

RM<br />

RM<br />

RM<br />

RM<br />