31.12.2014 Views

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 2 GATE DESIGN<br />

5.0 Fully Opening of Gate, In Continuous Operation, From Fully Closed Position<br />

The purpose of the test is to verify:<br />

a) Gate is capable of opening completely from fully closed position.<br />

b) Gate is capable of stopping automatically after reaching the fully opened position.<br />

c) The operating speed of gate from fully closed position to fully opened position is around<br />

300mm/min.<br />

Procedures of the test are as follow:<br />

a) Gate is in fully closed position.<br />

b) Switch the Local/Remote/Scada selector in MCC panel to “LOCAL<br />

c) Switch on the “OPEN” push button in Local Control Panel. The hydraulic system will be energized<br />

to make the hydraulic cylinder to open the gate.<br />

d) Measure the gate operating time from fully closed to fully opened position. Operating speed can<br />

be determined by dividing total operating time with 4m distance.<br />

e) Let the gate stop automatically.<br />

f) Check the position of gate to confirm that gate is in fully opened position. In fully opened<br />

position, the gate shall sit on the top of gate seat.<br />

6.0 Operation of Gate by Using Hydraulic H<strong>and</strong> pump<br />

The purpose of the test is to confirm the functioning of the manual h<strong>and</strong> pump mechanism.<br />

Procedures of the tests are as follow:<br />

a) Open the gate by using h<strong>and</strong> pump which is located on the Power Pack of the hydraulic unit. The<br />

gate shall be lowered down by at least 150mm height.<br />

b) After this, close the gate by using h<strong>and</strong> pump. The gate shall be raised up by at least 150mm<br />

height.<br />

7.0 Leakage Test<br />

The purpose is to verify that the leakage shall not exceed 0.15 litre per second per metre perimeter<br />

length of seal.<br />

Procedures of the tests are as follow:<br />

a) Raise the gate until fully closed position.<br />

b) Place the stoplog leaves insides the downstream stoplog grooves.<br />

c) Then, pump out the water between the gate <strong>and</strong> downstream stoplog.<br />

d) Measure the leakage water for 5 minutes, the allowable leakage should be less than 637 litres.<br />

2A-10 March 2009

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!