31.12.2014 Views

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Chapter 10 SCADA AND AUTOMATION SYSTEM<br />

10.4 SCADA SYSTEM NETWORK TOPOLOGY<br />

Fig. 10.2 Drainage And Irrigation SCADA System Network Topology<br />

Basically the system is divided into 3 major Level functional components which are:<br />

a) Level 1 <strong>–</strong> Core control of the system which involves all the combination of actuator, water<br />

level sensors, controllers <strong>and</strong> other related instruments to perform as the front end site<br />

control system.<br />

b) Level 2 <strong>–</strong> Communication medium such as GPRS/GSM/Internet which transfers the data from<br />

Level 1 to the server at Level 3 <strong>and</strong> exchange some of the others control parameter between<br />

Level 1 <strong>and</strong> Level 3<br />

c) Level 3 <strong>–</strong> Server which stores all the data from Level 1, analyses the collected data <strong>and</strong><br />

publish them to the public through internet.<br />

10.4.1 Level 1<br />

Level 1 is the front end processing centre which located at site mainly takes care of process control<br />

<strong>and</strong> process data analysis. Level 1 sometime is regarded as IO server. It consists of process<br />

controller <strong>and</strong> data processing unit. IO server provides open interface through st<strong>and</strong>ard protocol to<br />

the outside world. Through the open st<strong>and</strong>ard protocol, transmitting <strong>and</strong> receiving of data is made<br />

possible in varies communication medium through Level 2 such as GSM, GPRS, 3G <strong>and</strong> internet.<br />

Operator is able to receive <strong>and</strong> request for gate information via SMS. The Components of the Level 1<br />

including:<br />

March 2009 10-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!