Chapter 2 GATE DESIGN<br />

Installation Work<br />

Tilting Gate <strong>and</strong> Hydraulic Cylinder<br />

a) Assemble the various parts for the gate, namely, the side seals, shaft <strong>and</strong> bearing.<br />

b) Before lowering the gate into position, it is prudent to grease the seals in order to protect them<br />

from damage.<br />

c) Lower the gate into position by using of a mobile crane <strong>and</strong> locate the bearing blocks into the<br />

prepared anchor bolts as shown in the drawings. Finally, tighten bolts.<br />

d) After that the gate seals can be installed.<br />

e) Next, install the hydraulic cylinders to the cylinder pivot <strong>and</strong> locate the assembly at the prepared<br />

hydraulic pivot anchor site. Tighten the bolts.<br />

f) Finally, attach the hydraulic arms to their respective brackets on the gate.<br />

9.0 METHOD OF MEASUREMENT<br />

The total numbers of equipment to be installed.<br />

10.0 APPROVAL<br />

All documents or drawings, which are stated within this method statement, shall be approved or<br />

reviewed by consultant prior to installation works.<br />

11.0 SAFETY STATEMENT<br />

Refer to Job Safety Analysis<br />

12.0 QUALITY<br />

All inspection shall be in accordance to the approved Inspection <strong>and</strong> Test Plan.<br />

March 2009 2A-3