Chapter 7 ELECTRICAL SERVICES<br />

APPENDIX 7E SAMPLE CALCULATION FOR GENERATOR POWER RATING REQUIREMENT<br />

Calculating the generator power rating requirement for the pumping station with the following<br />

loads:-<br />

Starting<br />

Running<br />

Item KVA KW KVA KW<br />

Total lighting <strong>and</strong> small 17.5<br />

Power loads (G.L.) 20.13<br />

28x0.415x1.732x0.85<br />

=17.1KW .<br />

Start the 1 st pump<br />

10hpx5.3kVA/hp 53<br />

53kVAx0.85pf 45<br />

Add G.L.load 20.13 17.5 20.13 17.5<br />

Total 73.13 62.5 20.13 17.5<br />

Run the 1st pump<br />

At 0.88 efficiency<br />

10hpx0.746KW/hpx1/0.88 10.0 8.5<br />

Add G.L .load 20.13 17.5<br />

Total 30.13 26.0<br />

Start the 2nd pump<br />

10hpx5.3kVA/hp 53<br />

53kVAx0.85pf 45<br />

Run 1 st pump <strong>and</strong> G.L .load 30.13 26 30.13 26<br />

Total 83.13 71 30.13 26<br />

Run the 2 pump<br />

At 0.88 efficiency<br />

10hpx2x0.746KW/hpx1/0.88 19.95 16.96<br />

Add G.L .load 20.13 17.5<br />

Total 40.08 34.46<br />

Start the 3rd pump<br />

10hpx5.3kVA/hp 53<br />

53kVAx0.85pf 45<br />

Run 2 pump <strong>and</strong> G.L. load 40.08 34.46 40.08 34.46<br />

Total 93.08 79.46 40.08 34.46<br />

Run the 3 pump<br />

At 0.88 efficiency<br />

10hpx3x0.746KW/hpx1/0.88 29.92 25.43<br />

Add G.L .load 20.13 17.5<br />

Total 50.05 42.93<br />

The critical generator loads are the KVA <strong>and</strong> KW for starting the third pump. During the start, the<br />

first two running motors can act momentarily for half a cycle as generators <strong>and</strong>, hence, reduce the<br />

dem<strong>and</strong> on the generator, but the effect lasts much less than a second <strong>and</strong> is difficult to assess, so<br />

the effect is ignored, especially as it may take up to 6 second to start the 3 rd pump.<br />

The calculated KVA required is 93.08 KVA. Assuming that the generator efficiency as 0.85, the aging<br />

factor for 5 years is 0.8 <strong>and</strong> additional spare capacity required is 20%.<br />

The generator size is = 93.08x 1.2 KVA<br />

0.85x0.8<br />

= 164.26 KVA<br />

Hence the generator size selected shall be 175 KVA<br />