31.12.2014 Views

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

Volume 8 – Mechanical and Electrical Services - Malaysia Geoportal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Chapter 2 GATE DESIGN<br />

1.0 GENERAL<br />

This procedure briefly describes the work involved in the mechanical equipment installation.<br />

Quality control at various stages of the installation will ensure that the installed products<br />

will fulfill the requirement of the contractual specification.<br />

2.0 SCOPE<br />

The work covered by this Section shall include all labour, material, equipment, permits, <strong>and</strong><br />

services necessary for the execution of mechanical equipment installation <strong>and</strong> related work,<br />

complete in accordance with the drawings <strong>and</strong> specification for the Project.<br />

3.0 REFERENCE<br />

[1] Design St<strong>and</strong>ard BS 449, USBR Or JIS.<br />

4.0 RESPONSIBILITIES<br />

The Project Manager shall be responsible for the whole work. The Construction Manager <strong>and</strong><br />

Project Engineer shall assist Project Manager in executing the works. The Supervisor shall be<br />

based full time at site in monitoring the works.<br />

5.0 REFERENCE DRAWING<br />

Relevant reference drawing<br />

6.0 EQUIPMENTS & MACHINERIES REQUIRED<br />

Hydraulic mobile crane, generator set, welding set, scaffolding, power tools.<br />

7.0 MANPOWER<br />

Trade Engineer Supervisor Foreman Fitter Welder Helper<br />

No. 1 1 1 2 1 2<br />

8.0 SEQUENCE OF WORKS<br />

Receiving Equipment Delivery<br />

a) Check all in-coming materials with corresponding delivery order <strong>and</strong> packing list to ensure<br />

quantity <strong>and</strong> quality are in conformance.<br />

b) Inspection of materials as per requirement of ITP<br />

c) Store all equipment in proper manner for easy identification <strong>and</strong> issuance.<br />

Installation Work<br />

Tilting Gate Guide Installation<br />

The gate guides for the tilting gates consist of:-<br />

a) The sill beam<br />

b) The gate side seal guide or wall plate which runs vertically.<br />

March 2009 2A-5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!