8.3 LONG-TERM PROJECTS<br />

This section represents long-term projects that should be considered for implementation<br />

in the 10 to 20 year time frame <strong>of</strong> deployment. The long-term projects will build on the<br />

ITS infrastructure developed in the first ten years <strong>of</strong> deployment. During this time frame,<br />

the <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> should implement their remaining isolated traffic signals on the<br />

central signal system and deploy more ITS devices in critical areas or on priority<br />

corridors where there is a benefit. The main corridors where projects will be deployed by<br />

the end <strong>of</strong> the long-term time frame are shown in Figure 8.3.<br />

Long-term projects are separated into communications system projects, signal system<br />

projects, ATMS projects, ATIS projects, emergency vehicle and railroad crossing<br />

projects, transit projects, parking guidance projects, and integration projects.<br />

8.3.1 Communications System Projects<br />

• Interconnect the remaining isolated traffic signals and CCTV locations to the TMC.<br />

Remote locations may need to be connected via a wireless link.<br />

• Establish CDPD or other wireless connection from TMC to DMS, TBS and MVDS<br />

devices as necessary.<br />

• Interconnect the traffic signals and CCTV locations on the following priority corridors<br />

to the TMC via fiber optics:<br />

o MacArthur Avenue – Broadway to 35 th Avenue<br />

8.3.2 Signal System Projects<br />

• Replace all the remaining NEMA TS1 controllers and some NEMA cabinets (as<br />

necessary) with new controllers and cabinets and implement them on the new<br />

central signal system.<br />

• Implement VID systems at new traffic signals where applicable.<br />

8.3.3 Arterial Management System Projects<br />

• Make improvements or upgrades to the TMC as necessary. Consider expansion <strong>of</strong><br />

TMC into neighboring room.<br />

• Implement CCTV cameras at major intersections on priority corridors as necessary.<br />

• Implement MVDS or VID systems at mid block locations along priority corridors as<br />

necessary.<br />

• Implement additional DMS at major decision points throughout the <strong>City</strong>.<br />

• Implement additional trailblazer signs on detour routes or evacuation routes.<br />

• Implement ITS at more railroad crossings as necessary.<br />

• Consider opportunities for implementing new parking guidance systems.<br />

8.3.4 Traveler Information System Projects<br />

• Continue coordination efforts with MTC on procedures for including <strong>City</strong> <strong>of</strong> <strong>Oakland</strong><br />

major incidents and planned events in the 511/TravInfo® system.<br />

• Implement more kiosks at major transit hubs and tourist centers throughout the <strong>City</strong>.<br />

<strong>City</strong> <strong>of</strong> <strong>Oakland</strong> ITS Strategic Plan<br />

105 September, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!