8.3 LONG-TERM PROJECTS<br />
This section represents long-term projects that should be considered for implementation<br />
in the 10 to 20 year time frame <strong>of</strong> deployment. The long-term projects will build on the<br />
ITS infrastructure developed in the first ten years <strong>of</strong> deployment. During this time frame,<br />
the <strong>City</strong> <strong>of</strong> <strong>Oakland</strong> should implement their remaining isolated traffic signals on the<br />
central signal system and deploy more ITS devices in critical areas or on priority<br />
corridors where there is a benefit. The main corridors where projects will be deployed by<br />
the end <strong>of</strong> the long-term time frame are shown in Figure 8.3.<br />
Long-term projects are separated into communications system projects, signal system<br />
projects, ATMS projects, ATIS projects, emergency vehicle and railroad crossing<br />
projects, transit projects, parking guidance projects, and integration projects.<br />
8.3.1 Communications System Projects<br />
• Interconnect the remaining isolated traffic signals and CCTV locations to the TMC.<br />
Remote locations may need to be connected via a wireless link.<br />
• Establish CDPD or other wireless connection from TMC to DMS, TBS and MVDS<br />
devices as necessary.<br />
• Interconnect the traffic signals and CCTV locations on the following priority corridors<br />
to the TMC via fiber optics:<br />
o MacArthur Avenue – Broadway to 35 th Avenue<br />
8.3.2 Signal System Projects<br />
• Replace all the remaining NEMA TS1 controllers and some NEMA cabinets (as<br />
necessary) with new controllers and cabinets and implement them on the new<br />
central signal system.<br />
• Implement VID systems at new traffic signals where applicable.<br />
8.3.3 Arterial Management System Projects<br />
• Make improvements or upgrades to the TMC as necessary. Consider expansion <strong>of</strong><br />
TMC into neighboring room.<br />
• Implement CCTV cameras at major intersections on priority corridors as necessary.<br />
• Implement MVDS or VID systems at mid block locations along priority corridors as<br />
necessary.<br />
• Implement additional DMS at major decision points throughout the <strong>City</strong>.<br />
• Implement additional trailblazer signs on detour routes or evacuation routes.<br />
• Implement ITS at more railroad crossings as necessary.<br />
• Consider opportunities for implementing new parking guidance systems.<br />
8.3.4 Traveler Information System Projects<br />
• Continue coordination efforts with MTC on procedures for including <strong>City</strong> <strong>of</strong> <strong>Oakland</strong><br />
major incidents and planned events in the 511/TravInfo® system.<br />
• Implement more kiosks at major transit hubs and tourist centers throughout the <strong>City</strong>.<br />