9.7 O&M COSTS<br />

This section provides a high-level estimate <strong>of</strong> the anticipated costs that the <strong>City</strong> <strong>of</strong><br />

<strong>Oakland</strong> is likely to incur for the operations and management their ITS system over the<br />

next twenty years. Some <strong>of</strong> the costs will be recurring costs and some <strong>of</strong> the costs will<br />

be one time costs. An estimate <strong>of</strong> these costs is provided in Table 9.5. The total cost<br />

provided at the bottom <strong>of</strong> the table represents the estimated cost for operating and<br />

managing the ITS system for 20 years. The proportion <strong>of</strong> this cost will become greater<br />

in later years as more equipment is added to the citywide network. All costs are in 2003<br />

dollars.<br />

Table 9.5 – Estimated O&M Costs<br />

Description Item<br />

# <strong>of</strong><br />

years<br />

Annual<br />

Cost<br />

Total Cost<br />

Staffing<br />

14 FTEs for Maintenance 20 $1,400,000 $28,000,000<br />

5 FTEs for Operations 20 $600,000 $12,000,000<br />

Training 20 $15,000 $300,000<br />

Annual component replacement costs<br />

Near term 5 $150,000 $750,000<br />

Medium term 5 $250,000 $1,250,000<br />

Long term 10 $400,000 $4,000,000<br />

Fiber maintenance contract (if desired) 20 $50,000 $1,000,000<br />

One Time Costs<br />

Further Planning (O&M Manual, Performance Measures, etc.) 1 $150,000 $150,000<br />

Integrated Maintenance Management System 1 $250,000 $250,000<br />

Fiber Optic Fusion Splice and Termination Kit 1 $3,000 $3,000<br />

OTDR 1 $15,000 $15,000<br />

Fiber Optic Power Meter 1 $1,000 $1,000<br />

Initial Spare Parts Inventory 1 $150,000 $150,000<br />

TOTAL (20 years) $48M<br />

<strong>City</strong> <strong>of</strong> <strong>Oakland</strong> ITS Strategic Plan<br />

121 September, 2003

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!