9.7 O&M COSTS<br />
This section provides a high-level estimate <strong>of</strong> the anticipated costs that the <strong>City</strong> <strong>of</strong><br />
<strong>Oakland</strong> is likely to incur for the operations and management their ITS system over the<br />
next twenty years. Some <strong>of</strong> the costs will be recurring costs and some <strong>of</strong> the costs will<br />
be one time costs. An estimate <strong>of</strong> these costs is provided in Table 9.5. The total cost<br />
provided at the bottom <strong>of</strong> the table represents the estimated cost for operating and<br />
managing the ITS system for 20 years. The proportion <strong>of</strong> this cost will become greater<br />
in later years as more equipment is added to the citywide network. All costs are in 2003<br />
dollars.<br />
Table 9.5 – Estimated O&M Costs<br />
Description Item<br />
# <strong>of</strong><br />
years<br />
Annual<br />
Cost<br />
Total Cost<br />
Staffing<br />
14 FTEs for Maintenance 20 $1,400,000 $28,000,000<br />
5 FTEs for Operations 20 $600,000 $12,000,000<br />
Training 20 $15,000 $300,000<br />
Annual component replacement costs<br />
Near term 5 $150,000 $750,000<br />
Medium term 5 $250,000 $1,250,000<br />
Long term 10 $400,000 $4,000,000<br />
Fiber maintenance contract (if desired) 20 $50,000 $1,000,000<br />
One Time Costs<br />
Further Planning (O&M Manual, Performance Measures, etc.) 1 $150,000 $150,000<br />
Integrated Maintenance Management System 1 $250,000 $250,000<br />
Fiber Optic Fusion Splice and Termination Kit 1 $3,000 $3,000<br />
OTDR 1 $15,000 $15,000<br />
Fiber Optic Power Meter 1 $1,000 $1,000<br />
Initial Spare Parts Inventory 1 $150,000 $150,000<br />
TOTAL (20 years) $48M<br />
<strong>City</strong> <strong>of</strong> <strong>Oakland</strong> ITS Strategic Plan<br />